Heavy Construction — Pine, Minnesota

WD MN20260231-15535-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Pine, Minnesota (construction type: heavy) is $44.67/hr base + $26.90/hr fringe = $71.57/hr total package (WD MN20260231-15535-hvy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: MN20260231-15535-hvy
Revision: 1
Construction Type: heavy
State: Minnesota (MN)
County: Pine
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference MN20260231View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $36.13 $22.45 $58.58 $0.00 $0.00 $0.00 $0.00
BLASTER $38.53 $22.67 $61.20 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $47.25 $26.90 $74.15 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $45.69 $30.93 $76.62 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $47.45 $31.75 $79.20 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $32.13 $12.85 $44.98 +14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $48.56 $24.04 $72.60 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $45.61 $26.90 $72.51 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.02 $34.18 $83.20 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $40.81 $28.08 $68.89 Top 10% $0.00 $0.00 $0.00 $0.00
GROUND PERSON $33.40 $16.30 $49.70 Above median $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $45.56 $20.20 $65.76 $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.19 $35.68 $76.87 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $42.58 $26.33 $68.91 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $42.58 $26.33 $68.91 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $24.00 $16.96 $40.96 $0.00 $0.00 $0.00 $0.00
LINEMAN $47.71 $20.31 $68.02 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $48.13 $29.41 $77.54 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $45.50 $27.69 $73.19 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $41.29 $23.48 $64.77 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $45.71 $29.73 $75.44 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $50.64 $25.78 $76.42 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $46.08 $26.33 $72.41 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $41.02 $22.03 $63.05 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $42.58 $26.33 $68.91 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $40.81 $28.08 $68.89 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $40.88 $24.70 $65.58 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $40.25 $24.70 $64.95 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $40.13 $24.70 $64.83 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $39.85 $24.70 $64.55 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $35.63 $22.02 $57.65 $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $44.08 $26.33 $70.41 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $44.61 $20.61 $65.22 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pine, MN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pine

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260231-15535-hvy →