Residential Construction — Barry, Michigan

WD MI20260025-15487-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Barry, Michigan (construction type: residential) is $17.81/hr base + $5.73/hr fringe = $23.54/hr total package (WD MI20260025-15487-res, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: MI20260025-15487-res
Revision: 1
Construction Type: residential
State: Michigan (MI)
County: Barry
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference MI20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.81 $5.73 $23.54 -20% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.13 $3.47 $19.60 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.72 $5.43 $26.15 -25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.05 $4.65 $17.70 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.64 $2.81 $12.45 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.21 $13.45 $40.66 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE (IONIA COUNTY) $16.72 $12.75 $29.47 +26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.95 $5.46 $23.41 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.66 $7.65 $25.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.50 $5.10 $23.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LA $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $21.75 $11.94 $33.69 +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $21.84 $18.63 $40.47 +71% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY & IONIA COUNTIES) $31.35 $22.90 $54.25 +47% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY COUNTY) $27.18 $21.05 $48.23 +30% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) $39.89 $23.82 $63.71 +72% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) $37.09 $22.52 $59.61 +61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY & IONIA COUNTIES) $31.35 $22.90 $54.25 +47% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY COUNTY) $26.25 $20.10 $46.35 +25% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) $37.09 $22.52 $59.61 +61% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.65 $14.80 $47.45 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.60 $16.75 $43.35 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $32.00 $10.73 $42.73 +44% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $21.44 $11.44 $32.88 Bottom 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Barry, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Barry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260025-15487-res →