Residential Construction — Barry, Michigan
WD MI20260025-15487-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Barry, Michigan (construction type: residential) is $17.81/hr base + $5.73/hr fringe = $23.54/hr total package (WD MI20260025-15487-res, Rev. 1).
Scroll down for all 26 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $17.81 | $5.73 | $23.54 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.13 | $3.47 | $19.60 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $20.72 | $5.43 | $26.15 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $36.55 | $29.51 | $66.06 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.05 | $4.65 | $17.70 Above median -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 Above median +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE (IONIA COUNTY) | $16.72 | $12.75 | $29.47 +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 Above median +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LA | $41.28 | $25.25 | $66.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $21.75 | $11.94 | $33.69 +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $21.84 | $18.63 | $40.47 +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY & IONIA COUNTIES) | $31.35 | $22.90 | $54.25 +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY COUNTY) | $27.18 | $21.05 | $48.23 +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) | $39.89 | $23.82 | $63.71 +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) | $37.09 | $22.52 | $59.61 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY & IONIA COUNTIES) | $31.35 | $22.90 | $54.25 +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY COUNTY) | $26.25 | $20.10 | $46.35 +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY, IONIA, KENT & NEWAYGO COUNTIES) | $37.09 | $22.52 | $59.61 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.65 | $14.80 | $47.45 Above median +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $26.60 | $16.75 | $43.35 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $32.00 | $10.73 | $42.73 +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $21.44 | $11.44 | $32.88 Bottom 10% +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 Above median -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Barry, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Barry, Michigan.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.