Heavy Construction — Barry, Michigan

WD MI20260050-15487-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Barry, Michigan (construction type: heavy) is $31.50/hr base + $21.15/hr fringe = $52.65/hr total package (WD MI20260050-15487-hvy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: MI20260050-15487-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Barry
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference MI20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $31.50 $21.15 $52.65 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.31 $12.83 $35.14 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.78 $21.84 $64.62 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $25.74 $66.74 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER $23.34 $11.60 $34.94 +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $22.42 $12.95 $35.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.55 $12.95 $35.50 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.21 $1.96 $14.17 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.00 $4.66 $20.66 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $29.31 $2.64 $31.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.50 $5.10 $23.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.64 $0.00 $16.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.41 $4.97 $22.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLID $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEM $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $35.46 $25.25 $60.71 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $21.75 $11.94 $33.69 +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.75 $11.94 $34.69 +46% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $19.90 $5.63 $25.53 -31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $42.29 $23.94 $66.23 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.20 $22.35 $57.55 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.89 $23.82 $63.71 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Underground Construction- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $16.50 $4.89 $21.39 Above median -19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Barry, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Barry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260050-15487-hvy →