Building Construction — Barry, Michigan

WD MI20260076-15487-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Barry, Michigan (construction type: building) is $40.00/hr base + $23.65/hr fringe = $63.65/hr total package (WD MI20260076-15487-bld, Rev. 1).

Scroll down for all 53 trade classifications covered by this determination.

WD Number: MI20260076-15487-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Barry
Effective: May 17, 2026
Trades covered: 53
Official source: SAM.gov reference MI20260076View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $21.45 $5.00 $26.45 -13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.62 $6.42 $25.04 -15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.26 $2.69 $19.95 -32% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.49 $2.69 $21.18 -28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $31.50 $21.50 $53.00 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.16 $4.25 $21.41 -25% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $15.91 $2.92 $18.83 -37% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $21.34 $6.81 $28.15 -19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LOW VOLTAGE WIRING $25.98 $16.81 $42.79 +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LOW VOLTAGE WIRING $34.30 $22.16 $56.46 +117% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $15.29 $2.68 $17.97 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $16.75 $2.75 $19.50 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $36.55 $29.51 $66.06 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.13 $4.88 $23.01 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.64 $5.89 $23.53 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; SANDBLASTER $24.90 $12.95 $37.85 +62% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.47 $0.00 $10.47 Above median -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.87 $2.16 $21.03 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.01 $2.45 $16.46 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.32 $3.28 $21.60 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.50 $6.17 $22.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.50 $5.81 $24.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.28 $7.55 $26.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.16 $4.05 $21.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.72 $1.92 $17.64 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $27.32 $16.66 $43.98 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.21 $2.81 $19.02 -20% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $27.32 $16.66 $43.98 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION $47.40 $23.35 $70.75 +91% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION $32.50 $24.97 $57.47 +55% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $47.40 $23.35 $70.75 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $46.29 $25.43 $71.72 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $32.50 $24.97 $57.47 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.86 $6.11 $19.97 -26% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $22.28 $7.95 $30.23 +2% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $42.74 $21.53 $64.27 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $17.88 $4.73 $22.61 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.94 $21.15 $49.09 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAI $27.94 $21.15 $49.09 +91% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.20 $23.46 $55.66 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $32.20 $23.46 $55.66 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $17.00 $5.71 $22.71 Top 10% -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Barry, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Barry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260076-15487-bld →