Residential Construction — Scott, Iowa

WD IA20260019-16758-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Scott, Iowa (construction type: residential) is $35.53/hr base + $24.32/hr fringe = $59.85/hr total package (WD IA20260019-16758-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: IA20260019-16758-res
Revision: 1
Construction Type: residential
State: Iowa (IA)
County: Scott
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference IA20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $35.53 $24.32 $59.85 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $22.65 $16.43 $39.08 +50% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.27 $24.23 $55.50 +113% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.29 $28.45 $60.74 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.60 $17.81 $37.41 +24% vs market $0.00 $0.00 $0.00 $0.00
HUNDRED FEET OF BOOM OR OVER, OR CRANE WITH FIFTY TON OR OVER RATED LIFTING CAPACITY IS TO RECEIVE AN ADDITIONAL $.75 PER HOUR OVER TH OTHERWISE APPLI $37.80 $41.25 $79.05 $0.00 $0.00 $0.00 $0.00
HUNDRED FEET OF BOOM OR OVER, OR CRANE WITH FIFTY TON OR OVER RATED LIFTING CAPACITY IS TO RECEIVE AN ADDITIONAL $.75 PER HOUR OVER TH OTHERWISE APPLI $41.50 $41.25 $82.75 $0.00 $0.00 $0.00 $0.00
LABORER $30.06 $24.10 $54.16 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $30.06 $24.10 $54.16 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $30.06 $24.10 $54.16 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $31.56 $24.10 $55.66 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER $32.80 $20.25 $53.05 Above median $0.00 $0.00 $0.00 $0.00
ROOFER $38.23 $23.88 $62.11 Above median +174% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $15.04 $3.82 $18.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO FINISHER $28.27 $21.05 $49.32 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Scott, IA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Scott

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260019-16758-res →