Building Construction — Scott, Iowa

WD IA20260073-16758-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Scott, Iowa (construction type: building) is $36.06/hr base + $24.35/hr fringe = $60.41/hr total package (WD IA20260073-16758-bld, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: IA20260073-16758-bld
Revision: 1
Construction Type: building
State: Iowa (IA)
County: Scott
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference IA20260073View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.06 $24.35 $60.41 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.48 $33.91 $82.39 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.53 $24.32 $59.85 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.25 $29.53 $63.78 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.29 $28.45 $60.74 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $31.82 $19.05 $50.87 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $28.56 $74.56 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.50 $30.99 $68.49 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.53 $24.45 $59.98 +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $30.06 $24.10 $54.16 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $19.39 $8.17 $27.56 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $31.56 $24.10 $55.66 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $26.13 $13.56 $39.69 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.15 $8.10 $32.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $22.96 $7.49 $30.45 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER ONLY $31.32 $19.05 $50.37 +115% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $18.61 $0.00 $18.61 -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.10 $27.05 $73.15 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $32.29 $28.45 $60.74 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $46.10 $27.05 $73.15 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $41.50 $41.25 $82.75 Top 10% +181% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $37.80 $41.25 $79.05 Above median +169% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER; PAVER; ROLLER $41.50 $41.25 $82.75 +181% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 27.72 13.18 ROOFER $21.92 $5.07 $26.99 -9% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.80 $20.25 $53.05 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Scott, IA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Scott

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260073-16758-bld →