Highway Construction — Scott, Iowa

WD IA20260001-16758-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CABLE SPLICER in Scott, Iowa (construction type: highway) is $47.00/hr base + $28.56/hr fringe = $75.56/hr total package (WD IA20260001-16758-hwy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: IA20260001-16758-hwy
Revision: 1
Construction Type: highway
State: Iowa (IA)
County: Scott
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference IA20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CABLE SPLICER $47.00 $28.56 $75.56 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $34.67 $31.94 $66.61 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.12 $28.39 $61.51 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $28.56 $74.56 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.50 $30.99 $68.49 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER; LAYING $33.77 $23.60 $57.37 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRET $34.27 $23.60 $57.87 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 CONCRETE SPECIALIST $34.90 $23.60 $58.50 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.31 $29.89 $69.20 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $31.32 $19.05 $50.37 +115% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ELEVATED TANKS, BRIDGES, STACKS FLAG POLES, MFG, VESSELS (INTERIOR AND EXTERIOR SURFACES.$ 33.32 19.05 PAINTERS: DRYWALL TAPER $31.82 $19.05 $50.87 +117% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SIGN PAINTERS $28.05 $19.05 $47.10 +101% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, STRUCTURAL STEEL AND SANDBLASTING, INDUSTRIAL $31.82 $19.05 $50.87 +117% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $34.67 $31.94 $66.61 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, GROUP 1: CRANE; TOW OR PUSH BOAT $43.50 $41.25 $84.75 +188% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, GROUP 2: ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFI $41.50 $41.25 $82.75 +181% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, GROUP 3: ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER; CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRAN $38.85 $41.25 $80.10 +172% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:, GROUP 4: AIR COMPRESSOR; COMPACT LOADER; ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER; SMALL OUTBOARD MOTOR BOAT; WATE $37.80 $41.25 $79.05 +169% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USE $45.93 $16.11 $62.04 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCK $46.25 $16.11 $62.36 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 4 OIL DISTRIBUTORS, LOWBOYS FOOTNOTE: A. PENSION: $52.80 PER DAY $46.60 $16.11 $62.71 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK FOOTNOTE: A. PENSION: $52.80 PER DAY $47.71 $16.11 $63.82 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Scott, IA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Scott

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for IA20260001-16758-hwy →