Davis-Bacon Wage Determinations — Lake, Florida

Lake has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Lake, Florida cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: FL20260210-16485-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: FL20260002-16485-hvy Rev. 2
Effective: May 17, 2026
View trade rates →
highway Active
WD: FL20260254-16485-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: FL20260068-16485-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Lake

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL building $53.73 $38.44 $92.17 WD →
2 HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING D heavy $48.48 $15.34 $63.82 WD →
3 SPRINKLER FITTER building $35.03 $24.00 $59.03 WD →
4 MASTER OF TOWING VESSELS $1.80; LICENSED BOAT OPERATOR USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEE heavy $43.20 $14.99 $58.19 WD →
5 POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% building $39.01 $16.85 $55.86 WD →
6 POWER EQUIPMENT OPERATOR Group 1 150 ton lattice, 250 ton hydro, friction, tower and luffing cranes, 300+ ft boom building $39.01 $16.85 $55.86 WD →
7 POWER EQUIPMENT OPERATOR Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes building $38.01 $16.85 $54.86 WD →
8 POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES building $38.01 $16.85 $54.86 WD →
9 POWER EQUIPMENT OPERATOR Group 3 Cranes not described above; Mechanics building $37.01 $16.85 $53.86 WD →
10 POWER EQUIPMENT OPERATOR Group 3 Drill Rig, Horizontal Directional Drill Operator, Horizontal Direction Drill Locator heavy $37.01 $16.85 $53.86 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →