Building Construction — Lake, Florida

WD FL20260210-16485-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Lake, Florida (construction type: building) is $30.12/hr base + $13.11/hr fringe = $43.23/hr total package (WD FL20260210-16485-bld, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: FL20260210-16485-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Lake
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference FL20260210View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.12 $13.11 $43.23 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.65 $13.80 $42.45 +84% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $0.00 $19.27 -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $19.36 $6.19 $25.55 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.81 $11.58 $34.39 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.80 $0.00 $19.80 -23% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING $12.32 $0.00 $12.32 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.00 $0.54 $15.54 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.00 $3.43 $22.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.83 $0.00 $17.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.22 $0.00 $13.22 -40% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $53.73 $38.44 $92.17 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $22.39 $8.89 $31.28 +29% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $19.76 $3.41 $23.17 -5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $35.01 $16.85 $51.86 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $17.60 $1.39 $18.99 -15% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $25.75 $16.92 $42.67 +80% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 +143% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $17.25 $1.74 $18.99 -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.95 $2.28 $15.23 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lake, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lake

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260210-16485-bld →