Highway Construction — Yuma, Arizona

WD AZ20260050-16209-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Yuma, Arizona (construction type: highway) is $28.08/hr base + $12.74/hr fringe = $40.82/hr total package (WD AZ20260050-16209-hwy, Rev. 1).

Scroll down for all 46 trade classifications covered by this determination.

WD Number: AZ20260050-16209-hwy
Revision: 1
Construction Type: highway
State: Arizona (AZ)
County: Yuma
Effective: May 17, 2026
Trades covered: 46
Official source: SAM.gov reference AZ20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $28.08 $12.74 $40.82 +56% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FORMWORK CONCRETE $29.34 $7.09 $36.43 Bottom 10% +39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $26.96 $6.45 $33.41 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.71 $7.58 $36.29 +27% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $32.00 $17.54 $49.54 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.85 $7.97 $31.82 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $25.22 $5.08 $30.30 +36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTOR $22.00 $4.03 $26.03 Bottom 10% +17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL $23.22 $4.17 $27.39 +23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE SETTER $29.91 $9.26 $39.17 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GUARDRAIL INSTALLER $19.01 $2.99 $22.00 -1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE LABORER $19.44 $0.00 $19.44 -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $26.48 $7.09 $33.57 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $26.36 $7.09 $33.45 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: PAVEMENT MARKING $27.76 $6.34 $34.10 +50% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SIGN AND DISPLAY ERECTOR $19.84 $4.73 $24.57 Top 10% +8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.17 $18.12 $57.29 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE $26.16 $6.19 $32.35 +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $29.85 $8.78 $38.63 Bottom 10% +34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOOM/CRANE TRUCK $36.99 $12.37 $49.36 +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER $24.22 $4.77 $28.99 +1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER $26.88 $7.18 $34.06 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CONCRETE PUMP TRUCK $43.11 $10.87 $53.98 +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CONCRETE SCREED $26.41 $7.64 $34.05 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL RIG/AUGER $31.64 $0.00 $31.64 +10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $31.96 $8.33 $40.29 +40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON $35.44 $11.45 $46.89 Bottom 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $30.14 $12.57 $42.71 +48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADE CHECKER $24.58 $7.18 $31.76 Bottom 10% +10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL $31.98 $9.26 $41.24 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $27.43 $7.33 $34.76 +21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $31.86 $12.12 $43.98 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $29.25 $7.45 $36.70 Above median +27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE $30.13 $5.81 $35.94 Bottom 10% +25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $31.64 $10.13 $41.77 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT $31.47 $0.00 $31.47 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $26.29 $5.90 $32.19 Top 10% +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRENCHER $30.88 $9.26 $40.14 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $18.90 $0.00 $18.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $23.72 $0.00 $23.72 -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR $29.97 $9.43 $39.40 +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SWEEPER $20.24 $5.48 $25.72 +0% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER $26.13 $7.09 $33.22 +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Yuma, AZ — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Yuma

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260050-16209-hwy →