Wage Determination PA20260061-14542-bld
Northumberland, PA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination PA20260061-14542-bld covers 39 trade classifications for building construction in Northumberland, PA. Total packages (base + fringe) range from $17.21/hr to $99.85/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260061-14542-bld
Revision: 1
Type: building
County: Northumberland
State: PA
Effective: May 17, 2026
Trades covered: 39
Highest rate: $99.85/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.18 | $26.07 | $65.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.28 | $33.17 | $81.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.84 | $20.19 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $25.71 | $12.02 | $37.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.81 | $9.03 | $28.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $61.41 | $38.44 | $99.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $31.06 | $72.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $34.77 | $20.19 | $54.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $15.00 | $2.21 | $17.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $17.00 | $2.35 | $19.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.26 | $32.63 | $69.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $34.65 | $31.12 | $65.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $21.57 | $15.04 | $36.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $25.29 | $15.04 | $40.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $19.84 | $9.22 | $29.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $22.29 | $15.92 | $38.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.09 | $3.44 | $19.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | $13.93 | $40.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $36.53 | $22.01 | $58.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $37.10 | $27.62 | $64.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $24.31 | $3.95 | $28.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC UNIT INSTALLATION | $29.28 | $13.45 | $42.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (FORKLIFT)..$ 41.88 30.03 POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, BACKHOE/EXCAVATOR/TRACKHOE, FORKLIFT) | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.50 | $22.10 | $55.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 | $85.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $33.23 | $19.03 | $52.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/GRINDER | $33.94 | $19.03 | $52.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $33.83 | $20.78 | $54.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.76 | $17.16 | $45.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.64 | $21.63 | $57.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $24.98 | $11.88 | $36.86 | $0.00 | $0.00 | $0.00 | $0.00 |