Wage Determination OH20260104-17010-bld
Washington, OH · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination OH20260104-17010-bld covers 32 trade classifications for building construction in Washington, OH. Total packages (base + fringe) range from $29.17/hr to $78.12/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: OH20260104-17010-bld
Revision: 1
Type: building
County: Washington
State: OH
Effective: May 17, 2026
Trades covered: 32
Highest rate: $78.12/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $26.54 | $11.28 | $37.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $24.74 | $11.86 | $36.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.00 | $33.32 | $73.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $29.81 | $20.72 | $50.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $36.10 | $24.65 | $60.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.30 | $7.87 | $29.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $34.62 | $12.95 | $47.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.55 | $10.90 | $40.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $29.56 | $11.82 | $41.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $30.28 | $13.29 | $43.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $20.37 | $10.63 | $31.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $40.92 | $37.20 | $78.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $47.48 | $27.14 | $74.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $32.92 | $19.66 | $52.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $32.10 | $21.45 | $53.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $29.75 | $25.51 | $55.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 32.89 20.81 PAINTER: SPRAY | $22.78 | $12.40 | $35.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.31 | $10.45 | $38.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $29.92 | $16.77 | $46.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP | $22.78 | $12.61 | $35.39 | $0.00 | $0.00 | $0.00 | $0.00 |