Wage Determination NY20260027-16124-bld
Oswego, NY · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination NY20260027-16124-bld covers 30 trade classifications for building construction in Oswego, NY. Total packages (base + fringe) range from $20.47/hr to $85.53/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: NY20260027-16124-bld
Revision: 2
Type: building
County: Oswego
State: NY
Effective: May 17, 2026
Trades covered: 30
Highest rate: $85.53/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.25 | $27.29 | $70.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $34.15 | $19.71 | $53.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $32.59 | $23.24 | $55.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $33.12 | $16.84 | $49.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $23.25 | $21.21 | $44.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.50 | $35.03 | $85.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $30.00 | $27.59 | $57.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $26.37 | $9.91 | $36.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND REINFORCING | $37.16 | $30.68 | $67.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS ABATEMENT | $29.18 | $17.72 | $46.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $20.89 | $10.46 | $31.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $29.88 | $22.90 | $52.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.95 | $21.45 | $45.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $20.47 | $0.00 | $20.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $30.20 | $23.83 | $54.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | $17.76 | $53.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $31.03 | $20.05 | $51.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $33.14 | $21.04 | $54.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $30.19 | $17.42 | $47.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $28.51 | $12.31 | $40.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $24.39 | $21.61 | $46.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $23.25 | $21.21 | $44.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $31.43 | $23.61 | $55.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $35.51 | $24.57 | $60.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $48.11 | $31.85 | $79.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | $31.85 | $81.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $35.80 | $25.99 | $61.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER (INCLUDING INSTALLATION OF HVAC DUCT, METAL FLASHING, AND SIDING) | $36.29 | $23.31 | $59.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.06 | $30.71 | $75.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $31.81 | $17.50 | $49.31 | $0.00 | $0.00 | $0.00 | $0.00 |