Wage Determination NY20260012-16085-hwy

Suffolk, NY · highway · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination NY20260012-16085-hwy covers 56 trade classifications for highway construction in Suffolk, NY. Total packages (base + fringe) range from $55.68/hr to $150.97/hr, with the highest going to IRONWORKER: STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: NY20260012-16085-hwy
Revision: 2
Type: highway
County: Suffolk
State: NY
Effective: May 17, 2026
Trades covered: 56
Highest rate: $150.97/hr
Official source: SAM.gov reference NY20260012View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 BOOM LENGTHS $84.70 $40.15 $124.85 $0.00 $0.00 $0.00 $0.00
1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHIN $54.21 $39.99 $94.20 $0.00 $0.00 $0.00 $0.00
1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 $76.61 $40.15 $116.76 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $71.76 $36.81 $108.57 $0.00 $0.00 $0.00 $0.00
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN $68.88 $49.83 $118.71 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $67.39 $35.90 $103.29 $0.00 $0.00 $0.00 $0.00
CARPENTER $59.05 $48.08 $107.13 $0.00 $0.00 $0.00 $0.00
CARPENTERS $34.14 $23.15 $57.29 $0.00 $0.00 $0.00 $0.00
CARPENTERS $53.56 $34.28 $87.84 $0.00 $0.00 $0.00 $0.00
CARPENTERS $60.59 $55.84 $116.43 $0.00 $0.00 $0.00 $0.00
CARPENTERS $55.00 $55.84 $110.84 $0.00 $0.00 $0.00 $0.00
CARPENTERS $55.59 $55.41 $111.00 $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $75.46 $55.84 $131.30 $0.00 $0.00 $0.00 $0.00
CARPENTERS: NASSAU COUNTY AND SUFFOLK COUNTY $53.56 $34.28 $87.84 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $59.87 $41.81 $101.68 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $64.55 $47.40 $111.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $42.93 $32.43 $75.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $49.79 $32.27 $82.06 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $59.09 $45.56 $104.65 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, V $75.14 $47.45 $122.59 $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45 $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.00 $32.96 $89.96 $0.00 $0.00 $0.00 $0.00
IRONWORKER $60.40 $60.14 $120.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $48.15 $67.62 $115.77 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $58.95 $92.02 $150.97 $0.00 $0.00 $0.00 $0.00
LABORERS $42.55 $34.79 $77.34 $0.00 $0.00 $0.00 $0.00
LABORERS: ASBESTOS; LEAD; & HAZARDOUS WASTE LABORERS $41.15 $20.90 $62.05 $0.00 $0.00 $0.00 $0.00
LABORERS: PLASTERERS TENDERS $42.55 $34.79 $77.34 $0.00 $0.00 $0.00 $0.00
LABORERS: REGULAR LABORERS A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT $45.49 $35.98 $81.47 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL D $42.34 $30.05 $72.39 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILRO $56.46 $34.63 $91.09 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROA $70.57 $39.19 $109.76 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: MATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICA $61.40 $36.24 $97.64 $0.00 $0.00 $0.00 $0.00
LONG BOOM PREMIUMS: BOOM LENGTHS 100-149 FT 1.00 BOOM LENGHTS 150-249 FT 1.50 BOOM LENGHTS 250-349 FT 2.00 BOOM LENGTHS 350 FT 3.00 CRANES USING CLAMS $44.37 $12.95 $57.32 $0.00 $0.00 $0.00 $0.00
MASON - STONE $69.91 $44.02 $113.93 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $60.83 $58.03 $118.86 $0.00 $0.00 $0.00 $0.00
PAINTER $47.75 $44.11 $91.86 $0.00 $0.00 $0.00 $0.00
PAINTER $44.75 $44.11 $88.86 $0.00 $0.00 $0.00 $0.00
PAINTER $49.20 $57.20 $106.40 $0.00 $0.00 $0.00 $0.00
PAINTERS $56.25 $55.14 $111.39 $0.00 $0.00 $0.00 $0.00
PAINTERS $48.47 $35.91 $84.38 $0.00 $0.00 $0.00 $0.00
PLASTERER $48.51 $32.78 $81.29 $0.00 $0.00 $0.00 $0.00
PLUMBER $36.05 $19.63 $55.68 $0.00 $0.00 $0.00 $0.00
PLUMBER $60.73 $45.75 $106.48 $0.00 $0.00 $0.00 $0.00
PLUMBER, SERVICE FITTERS $47.85 $23.96 $71.81 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER, CHERRY PICKER, OVER 50 T $80.43 $39.99 $120.42 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR, DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE $76.44 $39.99 $116.43 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR, DINKY LOCOMOTIVE, FORKLIFT, HOIST, LO $79.33 $40.15 $119.48 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM $73.78 $39.99 $113.77 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR, COMPRESSOR, CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT, GENER $58.93 $40.15 $99.08 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 COMPRESSOR, COMPRESSOR, COMPRESSOR, COMPRESSOR, CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT, GENERATOR-PILE $56.54 $39.99 $96.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 BATCHING PLANT, GENERATOR, GRINDER, MIXER, MIXER, MIXER, MULCH MACHINE, OILER, PUMP, ROOT CUTTER, STUMP CHIPPER, TO $56.55 $40.15 $96.70 $0.00 $0.00 $0.00 $0.00
ROOFER $51.25 $47.36 $98.61 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.79 $25.37 $61.16 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $53.60 $60.74 $114.34 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETE $45.65 $56.20 $101.85 $0.00 $0.00 $0.00 $0.00
View all WDs for Suffolk → Revision history →