POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREMs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 8 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM is $113.77/hr, with the middle 80% of counties paying between $113.77 and $113.77/hr. The highest state average is New York at $113.77/hr; the lowest is New York at $113.77/hr.

Bottom 10%
$113.77
Median
$113.77
Average
$113.77
Top 10%
$113.77

Range: $113.77 – $113.77/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$113.77/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+303%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $73.78/hr
Avg total: $113.77/hr
8 rates

All Rates

8 county-level rates for POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Nassau NY building $73.78 $39.99 $113.77 WD →
Nassau NY heavy $73.78 $39.99 $113.77 WD →
Nassau NY highway $73.78 $39.99 $113.77 WD →
Nassau NY residential $73.78 $39.99 $113.77 WD →
Suffolk NY residential $73.78 $39.99 $113.77 WD →
Suffolk NY building $73.78 $39.99 $113.77 WD →
Suffolk NY highway $73.78 $39.99 $113.77 WD →
Suffolk NY heavy $73.78 $39.99 $113.77 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: GROUP 3 COMRPESSOR, COMPRESSOR, CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE, CURING MACHINE, FIREM →