LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWDs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 30 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD is $70.60/hr, with the middle 80% of counties paying between $70.60 and $70.60/hr. The highest state average is New York at $70.60/hr; the lowest is New York at $70.60/hr.

Bottom 10%
$70.60
Median
$70.60
Average
$70.60
Top 10%
$70.60

Range: $70.60 – $70.60/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$70.60/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+214.2%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

New York NY
Avg base: $42.80/hr
Avg total: $70.60/hr
30 rates

All Rates

30 county-level rates for LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Albany NY building $42.80 $27.80 $70.60 WD →
Albany NY highway $42.80 $27.80 $70.60 WD →
Albany NY heavy $42.80 $27.80 $70.60 WD →
Columbia NY heavy $42.80 $27.80 $70.60 WD →
Columbia NY highway $42.80 $27.80 $70.60 WD →
Columbia NY building $42.80 $27.80 $70.60 WD →
Fulton NY highway $42.80 $27.80 $70.60 WD →
Fulton NY building $42.80 $27.80 $70.60 WD →
Fulton NY heavy $42.80 $27.80 $70.60 WD →
Greene NY highway $42.80 $27.80 $70.60 WD →
Greene NY building $42.80 $27.80 $70.60 WD →
Greene NY heavy $42.80 $27.80 $70.60 WD →
Montgomery NY building $42.80 $27.80 $70.60 WD →
Montgomery NY heavy $42.80 $27.80 $70.60 WD →
Montgomery NY highway $42.80 $27.80 $70.60 WD →
Rensselaer NY heavy $42.80 $27.80 $70.60 WD →
Rensselaer NY building $42.80 $27.80 $70.60 WD →
Rensselaer NY highway $42.80 $27.80 $70.60 WD →
Saratoga NY building $42.80 $27.80 $70.60 WD →
Saratoga NY highway $42.80 $27.80 $70.60 WD →
Saratoga NY heavy $42.80 $27.80 $70.60 WD →
Schenectady NY heavy $42.80 $27.80 $70.60 WD →
Schenectady NY building $42.80 $27.80 $70.60 WD →
Schenectady NY highway $42.80 $27.80 $70.60 WD →
Schoharie NY heavy $42.80 $27.80 $70.60 WD →
Schoharie NY building $42.80 $27.80 $70.60 WD →
Schoharie NY highway $42.80 $27.80 $70.60 WD →
Washington NY building $42.80 $27.80 $70.60 WD →
Washington NY highway $42.80 $27.80 $70.60 WD →
Washington NY heavy $42.80 $27.80 $70.60 WD →
Top-paying counties for LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWD →