Wage Determination MO20260086-15901-bld
Polk, MO · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MO20260086-15901-bld covers 23 trade classifications for building construction in Polk, MO. Total packages (base + fringe) range from $25.93/hr to $82.53/hr, with the highest going to PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MO20260086-15901-bld
Revision: 1
Type: building
County: Polk
State: MO
Effective: May 17, 2026
Trades covered: 23
Highest rate: $82.53/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $41.15 | $23.90 | $65.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $29.50 | $21.50 | $51.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.40 | $18.32 | $49.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $32.25 | $20.81 | $53.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT & FROST INSULATOR | $42.97 | $29.84 | $72.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $39.00 | $34.25 | $73.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $20.49 | $10.76 | $31.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $34.05 | $15.73 | $49.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 | $46.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $40.82 | $17.56 | $58.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $47.29 | $22.42 | $69.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $39.61 | $30.15 | $69.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $20.78 | $5.15 | $25.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $39.35 | $15.72 | $55.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $52.60 | $29.93 | $82.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | $30.22 | $73.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | $30.22 | $73.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | $30.57 | $76.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | $30.22 | $73.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | $30.38 | $69.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $29.48 | $13.19 | $42.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.43 | $17.86 | $52.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $34.09 | $20.36 | $54.45 | $0.00 | $0.00 | $0.00 | $0.00 |