PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION — Prevailing Wage Rates

Davis-Bacon prevailing wages for PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATIONs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 24 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION is $76.10/hr, with the middle 80% of counties paying between $76.10 and $76.10/hr. The highest state average is Missouri at $76.10/hr; the lowest is Missouri at $76.10/hr.

Bottom 10%
$76.10
Median
$76.10
Average
$76.10
Top 10%
$76.10

Range: $76.10 – $76.10/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$76.10/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+151.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Missouri MO
Avg base: $49.45/hr
Avg total: $76.10/hr
24 rates

All Rates

24 county-level rates for PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Clark MO building $49.45 $26.65 $76.10 WD →
Daviess MO building $49.45 $26.65 $76.10 WD →
Gentry MO building $49.45 $26.65 $76.10 WD →
Grundy MO building $49.45 $26.65 $76.10 WD →
Harrison MO building $49.45 $26.65 $76.10 WD →
Holt MO building $49.45 $26.65 $76.10 WD →
Knox MO building $49.45 $26.65 $76.10 WD →
Lewis MO building $49.45 $26.65 $76.10 WD →
Linn MO building $49.45 $26.65 $76.10 WD →
Livingston MO building $49.45 $26.65 $76.10 WD →
Macon MO building $49.45 $26.65 $76.10 WD →
Marion MO building $49.45 $26.65 $76.10 WD →
Mercer MO building $49.45 $26.65 $76.10 WD →
Monroe MO building $49.45 $26.65 $76.10 WD →
Nodaway MO building $49.45 $26.65 $76.10 WD →
Pike MO building $49.45 $26.65 $76.10 WD →
Putnam MO building $49.45 $26.65 $76.10 WD →
Randolph MO building $49.45 $26.65 $76.10 WD →
Saline MO building $49.45 $26.65 $76.10 WD →
Schuyler MO building $49.45 $26.65 $76.10 WD →
Scotland MO building $49.45 $26.65 $76.10 WD →
Shelby MO building $49.45 $26.65 $76.10 WD →
Sullivan MO building $49.45 $26.65 $76.10 WD →
Worth MO building $49.45 $26.65 $76.10 WD →
Top-paying counties for PLUMBER, EXCLUDES HVAC PIPE INSTALLATION..$ 49.45 26.65 PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION →