Wage Determination MN20260023-15554-res

Chisago, MN · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MN20260023-15554-res covers 20 trade classifications for residential construction in Chisago, MN. Total packages (base + fringe) range from $11.50/hr to $94.79/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MN20260023-15554-res
Revision: 1
Type: residential
County: Chisago
State: MN
Effective: May 17, 2026
Trades covered: 20
Highest rate: $94.79/hr
Official source: SAM.gov reference MN20260023View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $40.63 $28.42 $69.05 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.91 $36.48 $90.39 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $59.00 $35.79 $94.79 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 $0.00 $0.00 $0.00 $0.00
LABOR DAY $48.32 $25.54 $73.86 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER $32.41 $17.44 $49.85 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 MASON TENDER, PIPELAYER $32.91 $17.44 $50.35 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE $33.44 $15.95 $49.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.89 $17.41 $49.30 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.45 $17.85 $49.30 $0.00 $0.00 $0.00 $0.00
PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY $59.54 $33.26 $92.80 $0.00 $0.00 $0.00 $0.00
PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY $50.23 $37.52 $87.75 $0.00 $0.00 $0.00 $0.00
ROOFER (ISANTI COUNTY, WRIGHT) $42.93 $22.87 $65.80 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY $45.01 $26.53 $71.54 $0.00 $0.00 $0.00 $0.00
View all WDs for Chisago → Revision history →