Wage determination MI20260036-15505-hvy covers 27 trade classifications for heavy construction in Gogebic, MI. Total packages (base + fringe) range from $12.63/hr to $74.72/hr, with the highest going to IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260036-15505-hvy
Revision: 1
Type: heavy
County: Gogebic
State: MI
Effective: May 17, 2026
Trades covered: 27
Highest rate: $74.72/hr
Official source: SAM.gov reference MI20260036View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $34.19 $24.65 $58.84 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $34.01 $23.14 $57.15 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.17 $10.13 $30.30 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.94 $21.80 $55.74 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $21.73 $53.48 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY $41.05 $33.67 $74.72 $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.96 $12.95 $35.91 $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.78 $12.95 $35.73 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.71 $3.35 $18.06 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $32.74 $13.45 $46.19 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.50 $1.06 $13.56 $0.00 $0.00 $0.00 $0.00
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 $37.26 $25.00 $62.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.61 $3.58 $19.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.63 $5.85 $22.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE $44.63 $25.00 $69.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE $44.92 $25.00 $69.92 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM A $40.51 $25.00 $65.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $34.48 $25.18 $59.66 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.63 $1.25 $13.88 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 $0.00 $0.00 $0.00 $0.00
View all WDs for Gogebic → Revision history →