OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 is $62.26/hr, with the middle 80% of counties paying between $62.26 and $62.26/hr. The highest state average is Michigan at $62.26/hr; the lowest is Michigan at $62.26/hr.

Bottom 10%
$62.26
Median
$62.26
Average
$62.26
Top 10%
$62.26

Range: $62.26 – $62.26/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Michigan MI
Avg base: $37.26/hr
Avg total: $62.26/hr
15 rates

All Rates

15 county-level rates for OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alger MI heavy $37.26 $25.00 $62.26 WD →
Baraga MI heavy $37.26 $25.00 $62.26 WD →
Chippewa MI heavy $37.26 $25.00 $62.26 WD →
Delta MI heavy $37.26 $25.00 $62.26 WD →
Dickinson MI heavy $37.26 $25.00 $62.26 WD →
Gogebic MI heavy $37.26 $25.00 $62.26 WD →
Houghton MI heavy $37.26 $25.00 $62.26 WD →
Iron MI heavy $37.26 $25.00 $62.26 WD →
Keweenaw MI heavy $37.26 $25.00 $62.26 WD →
Luce MI heavy $37.26 $25.00 $62.26 WD →
Mackinac MI heavy $37.26 $25.00 $62.26 WD →
Marquette MI heavy $37.26 $25.00 $62.26 WD →
Menominee MI heavy $37.26 $25.00 $62.26 WD →
Ontonagon MI heavy $37.26 $25.00 $62.26 WD →
Schoolcraft MI heavy $37.26 $25.00 $62.26 WD →
Top-paying counties for OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK EXCLUDES UNDERGROUND CONSTRUCTION FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 →