Wage Determination MI20260029-15440-hvy

Alcona, MI · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260029-15440-hvy covers 27 trade classifications for heavy construction in Alcona, MI. Total packages (base + fringe) range from $12.35/hr to $74.23/hr, with the highest going to OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: C. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260029-15440-hvy
Revision: 1
Type: heavy
County: Alcona
State: MI
Effective: May 17, 2026
Trades covered: 27
Highest rate: $74.23/hr
Official source: SAM.gov reference MI20260029View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $30.83 $21.09 $51.92 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.10 $12.38 $35.48 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.75 $25.60 $63.35 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $22.42 $12.95 $35.37 $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.02 $13.45 $38.47 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.28 $3.99 $19.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.07 $8.37 $24.44 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: C $48.98 $25.25 $74.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE $45.68 $25.25 $70.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER $32.98 $25.25 $58.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER FOOTNOTES: CRANE OPERATOR $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 $0.00 $0.00 $0.00 $0.00
PLUMBER $43.50 $21.10 $64.60 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:UNDERGROUND CONSTRUCTION GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, TRENCHER $45.98 $25.25 $71.23 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.10 $1.25 $12.35 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 $0.00 $0.00 $0.00 $0.00