OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PERs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 21 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER is $58.23/hr, with the middle 80% of counties paying between $58.23 and $58.23/hr. The highest state average is Michigan at $58.23/hr; the lowest is Michigan at $58.23/hr.

Bottom 10%
$58.23
Median
$58.23
Average
$58.23
Top 10%
$58.23

Range: $58.23 – $58.23/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Michigan MI
Avg base: $32.98/hr
Avg total: $58.23/hr
21 rates

All Rates

21 county-level rates for OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alcona MI heavy $32.98 $25.25 $58.23 WD →
Allegan MI heavy $32.98 $25.25 $58.23 WD →
Alpena MI heavy $32.98 $25.25 $58.23 WD →
Benzie MI heavy $32.98 $25.25 $58.23 WD →
Cheboygan MI heavy $32.98 $25.25 $58.23 WD →
Clare MI heavy $32.98 $25.25 $58.23 WD →
Crawford MI heavy $32.98 $25.25 $58.23 WD →
Emmet MI heavy $32.98 $25.25 $58.23 WD →
Grand Traverse MI heavy $32.98 $25.25 $58.23 WD →
Gratiot MI heavy $32.98 $25.25 $58.23 WD →
Iosco MI heavy $32.98 $25.25 $58.23 WD →
Isabella MI heavy $32.98 $25.25 $58.23 WD →
Kalkaska MI heavy $32.98 $25.25 $58.23 WD →
Montcalm MI heavy $32.98 $25.25 $58.23 WD →
Montmorency MI heavy $32.98 $25.25 $58.23 WD →
Oceana MI heavy $32.98 $25.25 $58.23 WD →
Ogemaw MI heavy $32.98 $25.25 $58.23 WD →
Oscoda MI heavy $32.98 $25.25 $58.23 WD →
Otsego MI heavy $32.98 $25.25 $58.23 WD →
Presque Isle MI heavy $32.98 $25.25 $58.23 WD →
Roscommon MI heavy $32.98 $25.25 $58.23 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER →