Wage Determination MD20260113-16457-bld
Charles, MD · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MD20260113-16457-bld covers 39 trade classifications for building construction in Charles, MD. Total packages (base + fringe) range from $31.69/hr to $98.34/hr, with the highest going to ELEVATOR MECHANIC. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MD20260113-16457-bld
Revision: 1
Type: building
County: Charles
State: MD
Effective: May 17, 2026
Trades covered: 39
Highest rate: $98.34/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BALANCING TECHNICIAN | $47.92 | $24.44 | $72.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $37.50 | $14.78 | $52.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $34.41 | $14.55 | $48.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET LAYER | $34.12 | $14.86 | $48.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATION INSTALLER TECHNICIAN | $33.04 | $12.36 | $45.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $55.50 | $21.97 | $77.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC | $54.77 | $43.57 | $98.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRESTOPPER | $29.81 | $10.08 | $39.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $35.60 | $14.41 | $50.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATION WORKER | $40.02 | $19.92 | $59.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $36.10 | $25.52 | $61.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $29.66 | $8.08 | $37.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.95 | $3.98 | $32.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $29.66 | $8.08 | $37.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $28.95 | $3.98 | $32.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| MECHANICAL SYSTEMS SERVICE TECH | $52.27 | $24.58 | $76.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $38.49 | $15.86 | $54.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $35.55 | $15.28 | $50.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $49.00 | $22.76 | $71.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $37.50 | $14.85 | $52.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $28.60 | $14.62 | $43.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $22.97 | $8.72 | $31.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $23.21 | $8.71 | $31.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $31.00 | $7.06 | $38.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $34.00 | $13.55 | $47.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $29.66 | $8.67 | $38.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $30.46 | $12.50 | $42.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $24.88 | $7.00 | $31.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $36.72 | $10.97 | $47.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (SKID STEER) | $29.00 | $5.75 | $34.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $35.00 | $10.71 | $45.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $41.00 | $18.10 | $59.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR | $32.35 | $10.71 | $43.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $36.24 | $14.62 | $50.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| RESILIENT FLOOR | $34.12 | $14.86 | $48.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER/WATERPROOFER | $52.21 | $14.91 | $67.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEETMETAL WORKER | $47.92 | $24.44 | $72.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $42.32 | $26.05 | $68.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| STEAMFITTER/PIPEFITTER | $52.27 | $24.58 | $76.85 | $0.00 | $0.00 | $0.00 | $0.00 |