POWER EQUIPMENT OPERATOR (SKID STEER) — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR (SKID STEER)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 65 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR (SKID STEER) is $43.59/hr, with the middle 80% of counties paying between $22.45 and $50.04/hr. The highest state average is Maryland at $36.70/hr; the lowest is Maryland at $36.70/hr.

Bottom 10%
$22.45
Median
$43.59
Average
$36.70
Top 10%
$50.04

Range: $18.67 – $52.72/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$43.59/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+54.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Maryland MD
Avg base: $27.15/hr
Avg total: $36.70/hr
65 rates

All Rates

65 county-level rates for POWER EQUIPMENT OPERATOR (SKID STEER), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allegany MD building $36.02 $16.70 $52.72 WD →
Allegany MD heavy $35.47 $16.70 $52.17 WD →
Allegany MD highway $35.47 $16.70 $52.17 WD →
Anne Arundel MD building $32.23 $14.62 $46.85 WD →
Anne Arundel MD highway $30.04 $13.55 $43.59 WD →
Anne Arundel MD heavy $30.04 $13.55 $43.59 WD →
Baltimore MD highway $30.04 $13.55 $43.59 WD →
Baltimore MD building $32.23 $14.62 $46.85 WD →
Baltimore MD heavy $30.04 $13.55 $43.59 WD →
Baltimore City MD building $32.23 $14.62 $46.85 WD →
Baltimore City MD highway $30.04 $13.55 $43.59 WD →
Baltimore City MD heavy $30.04 $13.55 $43.59 WD →
Calvert MD building $29.00 $5.75 $34.75 WD →
Caroline MD heavy $23.88 $3.17 $27.05 WD →
Caroline MD building $19.38 $2.32 $21.70 WD →
Caroline MD highway $23.88 $3.17 $27.05 WD →
Carroll MD highway $30.04 $13.55 $43.59 WD →
Carroll MD building $31.00 $13.55 $44.55 WD →
Carroll MD heavy $30.04 $13.55 $43.59 WD →
Cecil MD highway $20.50 $5.10 $25.60 WD →
Cecil MD building $19.38 $2.32 $21.70 WD →
Cecil MD heavy $20.50 $5.10 $25.60 WD →
Charles MD building $29.00 $5.75 $34.75 WD →
Dorchester MD heavy $22.75 $5.12 $27.87 WD →
Dorchester MD building $32.23 $14.62 $46.85 WD →
Dorchester MD highway $22.75 $5.12 $27.87 WD →
Frederick MD building $32.23 $14.62 $46.85 WD →
Frederick MD heavy $30.04 $13.55 $43.59 WD →
Frederick MD highway $30.04 $13.55 $43.59 WD →
Garrett MD building $36.02 $16.70 $52.72 WD →
Garrett MD highway $21.00 $4.18 $25.18 WD →
Garrett MD heavy $21.00 $4.18 $25.18 WD →
Harford MD highway $30.04 $13.55 $43.59 WD →
Harford MD building $31.00 $13.55 $44.55 WD →
Harford MD heavy $30.04 $13.55 $43.59 WD →
Howard MD heavy $30.04 $13.55 $43.59 WD →
Howard MD building $32.23 $14.62 $46.85 WD →
Howard MD highway $30.04 $13.55 $43.59 WD →
Kent MD building $19.38 $2.32 $21.70 WD →
Kent MD heavy $20.00 $3.58 $23.58 WD →
Kent MD highway $20.00 $3.58 $23.58 WD →
Montgomery MD highway $30.04 $13.55 $43.59 WD →
Montgomery MD building $29.00 $5.75 $34.75 WD →
Montgomery MD heavy $30.04 $13.55 $43.59 WD →
Prince George's MD highway $30.04 $13.55 $43.59 WD →
Prince George's MD heavy $30.04 $13.55 $43.59 WD →
Prince George's MD building $29.00 $5.75 $34.75 WD →
Queen Anne's MD heavy $20.50 $5.10 $25.60 WD →
Queen Anne's MD building $19.38 $2.32 $21.70 WD →
Queen Anne's MD highway $20.50 $5.10 $25.60 WD →
Somerset MD building $32.23 $14.62 $46.85 WD →
Somerset MD heavy $22.75 $5.12 $27.87 WD →
Somerset MD highway $22.75 $5.12 $27.87 WD →
Talbot MD heavy $23.56 $4.97 $28.53 WD →
Talbot MD highway $23.56 $4.97 $28.53 WD →
Talbot MD building $19.38 $2.32 $21.70 WD →
Washington MD building $36.02 $16.70 $52.72 WD →
Washington MD heavy $35.47 $16.70 $52.17 WD →
Washington MD highway $35.47 $16.70 $52.17 WD →
Wicomico MD highway $25.00 $3.12 $28.12 WD →
Wicomico MD heavy $25.00 $3.12 $28.12 WD →
Wicomico MD building $19.00 $7.83 $26.83 WD →
Worcester MD heavy $18.00 $0.67 $18.67 WD →
Worcester MD highway $18.00 $0.67 $18.67 WD →
Worcester MD building $19.00 $7.83 $26.83 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR (SKID STEER) →