Wage Determination LA20260008-20041-hvy
St John the Baptist, LA · heavy · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination LA20260008-20041-hvy covers 37 trade classifications for heavy construction in St John the Baptist, LA. Total packages (base + fringe) range from $12.92/hr to $54.50/hr, with the highest going to MILLWRIGHT. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: LA20260008-20041-hvy
Revision: 2
Type: heavy
County: St John the Baptist
State: LA
Effective: May 17, 2026
Trades covered: 37
Highest rate: $54.50/hr