PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES) — Prevailing Wage Rates

Davis-Bacon prevailing wages for PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES)s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 25 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES) is $48.92/hr, with the middle 80% of counties paying between $48.92 and $48.92/hr. The highest state average is Louisiana at $48.92/hr; the lowest is Louisiana at $48.92/hr.

Bottom 10%
$48.92
Median
$48.92
Average
$48.92
Top 10%
$48.92

Range: $48.92 – $48.92/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$48.92/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+61.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Louisiana LA
Avg base: $32.42/hr
Avg total: $48.92/hr
25 rates

All Rates

25 county-level rates for PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES), ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Acadia LA heavy $32.42 $16.50 $48.92 WD →
Ascension LA heavy $32.42 $16.50 $48.92 WD →
Bossier LA heavy $32.42 $16.50 $48.92 WD →
Caddo LA heavy $32.42 $16.50 $48.92 WD →
Calcasieu LA heavy $32.42 $16.50 $48.92 WD →
East Baton Rouge LA heavy $32.42 $16.50 $48.92 WD →
Jefferson LA heavy $32.42 $16.50 $48.92 WD →
Lafayette LA heavy $32.42 $16.50 $48.92 WD →
Lafourche LA heavy $32.42 $16.50 $48.92 WD →
Livingston LA heavy $32.42 $16.50 $48.92 WD →
Orleans LA heavy $32.42 $16.50 $48.92 WD →
Ouachita LA heavy $32.42 $16.50 $48.92 WD →
Plaquemines LA heavy $32.42 $16.50 $48.92 WD →
Rapides LA heavy $32.42 $16.50 $48.92 WD →
St Bernard LA heavy $32.42 $16.50 $48.92 WD →
St Charles LA heavy $32.42 $16.50 $48.92 WD →
St James LA heavy $32.42 $16.50 $48.92 WD →
St James LA heavy $32.42 $16.50 $48.92 WD →
St John the Baptist LA heavy $32.42 $16.50 $48.92 WD →
St John the Baptist LA heavy $32.42 $16.50 $48.92 WD →
St Landry LA heavy $32.42 $16.50 $48.92 WD →
St Martin LA heavy $32.42 $16.50 $48.92 WD →
St Tammany LA heavy $32.42 $16.50 $48.92 WD →
Terrebonne LA heavy $32.42 $16.50 $48.92 WD →
Webster LA heavy $32.42 $16.50 $48.92 WD →
Top-paying counties for PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES) →