|
ADDITIONAL ONE DOLLAR AND TWENTY FIVE CENTS PER HOUR ABOVE THE REGULAR RATE
|
$26.75 |
$23.00 |
$49.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF ME
|
$38.19 |
$23.59 |
$61.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF M
|
$40.20 |
$25.68 |
$65.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BOILERMAKER
|
$43.24 |
$38.17 |
$81.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONEMASON
|
$34.17 |
$20.14 |
$54.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONEMASON
|
$35.21 |
$18.19 |
$53.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: TERRAZZO FINISHER......................................$ 23.38 1,315.00 BRICKLAYER: TERRAZZO
|
$27.50 |
$15.20 |
$42.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: TILE, MARBLE, MOSAIC
|
$35.63 |
$17.23 |
$52.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: CARPENTER
|
$33.09 |
$26.50 |
$59.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: CARPENTER
|
$33.08 |
$26.46 |
$59.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: PILEDRIVER
|
$34.04 |
$26.50 |
$60.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: PILEDRIVER
|
$34.08 |
$26.46 |
$60.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTERS: SOFT FLOOR LAYERS
|
$35.54 |
$22.12 |
$57.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$25.75 |
$13.50 |
$39.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$28.50 |
$13.50 |
$42.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$26.30 |
$16.91 |
$43.21 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
COMMUNICATION TECHNICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOU
|
$30.00 |
$18.07 |
$48.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$46.14 |
$21.90 |
$68.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$45.45 |
$28.19 |
$73.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.00 |
$27.36 |
$67.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$43.30 |
$25.32 |
$68.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELEVATOR MECHANIC A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS
|
$60.17 |
$38.44 |
$98.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELEVATOR MECHANIC FOOTNOTES: A) EMPLOYER CONTRIBUTES AS A VACATION PAY CREDIT 8% BASIC HOURLY RATE FOR MORE THAN 5 YEARS OF SERVICE AND 6% BASIC HOURL
|
$62.73 |
$38.44 |
$101.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$35.13 |
$19.57 |
$54.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$36.03 |
$20.55 |
$56.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS
|
$23.00 |
$14.40 |
$37.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER
|
$38.00 |
$26.39 |
$64.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER
|
$35.34 |
$25.75 |
$61.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men
|
$23.18 |
$16.00 |
$39.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 2: Concrete Repairmen, Lock Tenders, Motor men, Muckers, Grout Machine, Track Laye
|
$23.93 |
$16.00 |
$39.93 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power K
|
$24.18 |
$16.00 |
$40.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives
|
$24.18 |
$16.00 |
$40.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 BUILDING & CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; IRONWORKER TENDER; MECHANIC TENDER; CIVIL ENGINEER TENDER; RODMEN AND CHAINMEN
|
$30.47 |
$19.20 |
$49.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS; MECHANIC TENDERS; FLAG & SIGNAL PERSON; WINDOW WASHERS & CLEANERS; WATERBOYS
|
$28.43 |
$18.55 |
$46.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 PLASTERERS' TENDERS; MORTAR MIXERS; WELDERS; CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDER
|
$29.18 |
$18.55 |
$47.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 2 WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL; ASPHALT RAKER & LUTEMAN; KETTLEMAN; HANDLING AND REMOVAL HAZARD
|
$31.07 |
$19.20 |
$50.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES LABORERS CLASSIFICATIONS FOR CAISSON AND TUNNEL WOR
|
$30.43 |
$18.55 |
$48.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 3 PLASTERER TENDER; MASON TENDER; MORTAR MIXER; WELDER; CUTTING TORCH OR BURNER; CEMENT GUN OPERATOR; SCAFFOLD BUILDER
|
$33.47 |
$19.20 |
$52.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: GROUP 4 DYNAMITE MAN
|
$33.97 |
$19.20 |
$53.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE, TILE & TERRAZZO FINISHER
|
$22.09 |
$16.34 |
$38.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MARBLE, TILE & TERRAZZO WORKERS
|
$28.49 |
$16.46 |
$44.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT, ZONE 1
|
$36.30 |
$28.37 |
$64.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT, ZONE 2
|
$35.00 |
$29.33 |
$64.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OV
|
$31.20 |
$15.55 |
$46.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL S
|
$31.12 |
$21.20 |
$52.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: DRYWALL & PAPER HANGERS FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRU
|
$33.20 |
$15.55 |
$48.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL
|
$31.87 |
$21.20 |
$53.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY & POT MAN FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES O
|
$32.20 |
$15.55 |
$47.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER: AREA #46
|
$31.50 |
$18.32 |
$49.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS
|
$46.42 |
$21.33 |
$67.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS (CLAY, GREENE, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES)
|
$46.65 |
$21.95 |
$68.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WIT
|
$33.90 |
$23.00 |
$56.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE
|
$43.43 |
$19.60 |
$63.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR, AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRUBTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRET
|
$35.30 |
$19.60 |
$54.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL
|
$34.20 |
$15.55 |
$49.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$30.00 |
$18.30 |
$48.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS
|
$32.00 |
$16.61 |
$48.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: COMPOSITION
|
$31.60 |
$19.43 |
$51.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFERS: SLATE & TILE
|
$31.60 |
$19.43 |
$51.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER HVAC DUCT WORK
|
$39.53 |
$22.92 |
$62.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER HVAC DUCT WORK
|
$40.19 |
$27.33 |
$67.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SPRINKLER FITTER
|
$44.20 |
$27.88 |
$72.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE
|
$32.12 |
$21.20 |
$53.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$37.97 |
$18.06 |
$56.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
THE COURT HOUSE))
|
$50.05 |
$20.39 |
$70.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE, MARBLE SETTER
|
$37.22 |
$18.05 |
$55.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 1 PICKUP TRUCKS, WINCH TRUCKS, WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS
|
$27.08 |
$21.52 |
$48.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 1 SINGLE AXLE TRUCKS SEVEN CU.YDS. OR LESS THAN TEN AND 0NE-HALF TONS, DUMPSTERS, SCOOP-MOBILES FIVE CU. YDS. AND UNDER OR LESS T
|
$32.67 |
$0.42 |
$33.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN CU.YDS.OR TWENTY- FOUR TONS GROSS, SIX WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCK
|
$33.17 |
$0.42 |
$33.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS
|
$27.54 |
$21.52 |
$49.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS
|
$33.37 |
$0.42 |
$33.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI- TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMP
|
$27.76 |
$21.52 |
$49.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLID
|
$33.52 |
$0.42 |
$33.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVERS: GROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. A: $36.40 PER DAY & 450.00 PER WEEK
|
$34.02 |
$0.42 |
$34.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |