POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 67 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE is $63.03/hr, with the middle 80% of counties paying between $63.03 and $63.03/hr. The highest state average is Indiana at $63.03/hr; the lowest is Indiana at $63.03/hr.

Bottom 10%
$63.03
Median
$63.03
Average
$63.03
Top 10%
$63.03

Range: $63.03 – $63.03/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$63.03/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+123.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $43.43/hr
Avg total: $63.03/hr
67 rates

All Rates

67 county-level rates for POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams IN building $43.43 $19.60 $63.03 WD →
Allen IN building $43.43 $19.60 $63.03 WD →
Bartholomew IN building $43.43 $19.60 $63.03 WD →
Benton IN building $43.43 $19.60 $63.03 WD →
Blackford IN building $43.43 $19.60 $63.03 WD →
Boone IN building $43.43 $19.60 $63.03 WD →
Brown IN building $43.43 $19.60 $63.03 WD →
Carroll IN building $43.43 $19.60 $63.03 WD →
Cass IN building $43.43 $19.60 $63.03 WD →
Clark IN building $43.43 $19.60 $63.03 WD →
Clay IN building $43.43 $19.60 $63.03 WD →
Clinton IN building $43.43 $19.60 $63.03 WD →
DeKalb IN building $43.43 $19.60 $63.03 WD →
DeKalb IN building $43.43 $19.60 $63.03 WD →
Dearborn IN building $43.43 $19.60 $63.03 WD →
Decatur IN building $43.43 $19.60 $63.03 WD →
Delaware IN building $43.43 $19.60 $63.03 WD →
Fayette IN building $43.43 $19.60 $63.03 WD →
Floyd IN building $43.43 $19.60 $63.03 WD →
Fountain IN building $43.43 $19.60 $63.03 WD →
Franklin IN building $43.43 $19.60 $63.03 WD →
Fulton IN building $43.43 $19.60 $63.03 WD →
Gibson IN building $43.43 $19.60 $63.03 WD →
Grant IN building $43.43 $19.60 $63.03 WD →
Greene IN building $43.43 $19.60 $63.03 WD →
Hamilton IN building $43.43 $19.60 $63.03 WD →
Hancock IN building $43.43 $19.60 $63.03 WD →
Harrison IN building $43.43 $19.60 $63.03 WD →
Hendricks IN building $43.43 $19.60 $63.03 WD →
Henry IN building $43.43 $19.60 $63.03 WD →
Howard IN building $43.43 $19.60 $63.03 WD →
Huntington IN building $43.43 $19.60 $63.03 WD →
Jay IN building $43.43 $19.60 $63.03 WD →
Jennings IN building $43.43 $19.60 $63.03 WD →
Johnson IN building $43.43 $19.60 $63.03 WD →
Madison IN building $43.43 $19.60 $63.03 WD →
Marion IN building $43.43 $19.60 $63.03 WD →
Miami IN building $43.43 $19.60 $63.03 WD →
Monroe IN building $43.43 $19.60 $63.03 WD →
Montgomery IN building $43.43 $19.60 $63.03 WD →
Morgan IN building $43.43 $19.60 $63.03 WD →
Noble IN building $43.43 $19.60 $63.03 WD →
Ohio IN building $43.43 $19.60 $63.03 WD →
Owen IN building $43.43 $19.60 $63.03 WD →
Parke IN building $43.43 $19.60 $63.03 WD →
Posey IN building $43.43 $19.60 $63.03 WD →
Putnam IN building $43.43 $19.60 $63.03 WD →
Randolph IN building $43.43 $19.60 $63.03 WD →
Ripley IN building $43.43 $19.60 $63.03 WD →
Rush IN building $43.43 $19.60 $63.03 WD →
Shelby IN building $43.43 $19.60 $63.03 WD →
Steuben IN building $43.43 $19.60 $63.03 WD →
Sullivan IN building $43.43 $19.60 $63.03 WD →
Switzerland IN building $43.43 $19.60 $63.03 WD →
Tippecanoe IN building $43.43 $19.60 $63.03 WD →
Tipton IN building $43.43 $19.60 $63.03 WD →
Union IN building $43.43 $19.60 $63.03 WD →
Vanderburgh IN building $43.43 $19.60 $63.03 WD →
Vermillion IN building $43.43 $19.60 $63.03 WD →
Vigo IN building $43.43 $19.60 $63.03 WD →
Wabash IN building $43.43 $19.60 $63.03 WD →
Warren IN building $43.43 $19.60 $63.03 WD →
Warrick IN building $43.43 $19.60 $63.03 WD →
Wayne IN building $43.43 $19.60 $63.03 WD →
Wells IN building $43.43 $19.60 $63.03 WD →
White IN building $43.43 $19.60 $63.03 WD →
Whitley IN building $43.43 $19.60 $63.03 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE, AUTO PATROL, BALLAST REGULATOR, BATCHER PLANT, BENDING MACHINE →