Wage Determination IA20260076-15114-bld
Washington, IA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination IA20260076-15114-bld covers 26 trade classifications for building construction in Washington, IA. Total packages (base + fringe) range from $20.76/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: IA20260076-15114-bld
Revision: 1
Type: building
County: Washington
State: IA
Effective: May 17, 2026
Trades covered: 26
Highest rate: $94.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $29.80 | $17.16 | $46.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $24.90 | $9.60 | $34.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $23.97 | $3.09 | $27.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 | $60.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.06 | $8.14 | $34.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR: MECHANICAL | $16.70 | $8.12 | $24.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.52 | $4.24 | $20.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $28.33 | $19.82 | $48.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $29.55 | $12.10 | $41.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $19.76 | $9.05 | $28.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $30.25 | $11.88 | $42.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $29.11 | $11.55 | $40.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- BACKHOE/EXCAVATOR/TRACKHOE | $35.02 | $21.94 | $56.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- LOADER | $34.70 | $21.94 | $56.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- LOADER WITH OR WITHOUT ATTACHMENTS, PAVER, ROLLER | $32.62 | $21.94 | $54.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $21.92 | $5.07 | $26.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $41.45 | $23.11 | $64.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | $0.00 | $0.00 | $0.00 | $0.00 |