Wage Determination IA20260066-15103-bld
Grundy, IA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination IA20260066-15103-bld covers 27 trade classifications for building construction in Grundy, IA. Total packages (base + fringe) range from $17.03/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: IA20260066-15103-bld
Revision: 1
Type: building
County: Grundy
State: IA
Effective: May 17, 2026
Trades covered: 27
Highest rate: $94.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $24.90 | $9.60 | $34.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $20.64 | $8.08 | $28.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.74 | $4.16 | $24.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $35.39 | $15.59 | $50.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR: MECHANICAL | $23.28 | $8.91 | $32.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 | $68.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 | $59.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.56 | $2.47 | $17.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $19.39 | $8.17 | $27.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $29.36 | $17.99 | $47.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $26.13 | $13.56 | $39.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $24.15 | $8.10 | $32.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 | $30.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $29.55 | $12.10 | $41.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $19.76 | $9.05 | $28.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $20.29 | $8.57 | $28.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $24.71 | $8.80 | $33.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- BACKHOE/EXCAVATOR/TRACKHOE | $39.00 | $18.35 | $57.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- BOBCAT/SKID STEER/SKID LOADER, PAVER, ROLLER | $35.29 | $18.35 | $53.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- LOADER | $37.62 | $18.35 | $55.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $21.92 | $5.07 | $26.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.57 | $9.41 | $31.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.99 | $26.42 | $72.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $30.65 | $20.10 | $50.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | $0.00 | $0.00 | $0.00 | $0.00 |