Wage Determination IA20260064-15124-bld

Dallas, IA · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination IA20260064-15124-bld covers 27 trade classifications for building construction in Dallas, IA. Total packages (base + fringe) range from $16.11/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: IA20260064-15124-bld
Revision: 1
Type: building
County: Dallas
State: IA
Effective: May 17, 2026
Trades covered: 27
Highest rate: $94.74/hr
Official source: SAM.gov reference IA20260064View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $48.48 $33.91 $82.39 $0.00 $0.00 $0.00 $0.00
BRICKLAYER AND STONEMASON $37.44 $19.12 $56.56 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.50 $21.43 $56.93 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.55 $23.83 $58.38 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $21.87 $10.32 $32.19 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.45 $20.94 $66.39 $0.00 $0.00 $0.00 $0.00
INSULATOR: MECHANICAL $18.45 $4.04 $22.49 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.53 $24.45 $59.98 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $37.50 $30.99 $68.49 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $37.80 $23.54 $61.34 $0.00 $0.00 $0.00 $0.00
LABORER $29.36 $17.99 $47.35 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $29.36 $17.99 $47.35 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.11 $0.00 $16.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $33.57 $20.75 $54.32 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.70 $9.13 $34.83 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.41 $16.30 $48.71 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.77 $6.64 $26.41 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.20 $23.25 $68.45 $0.00 $0.00 $0.00 $0.00
PLUMBER $45.20 $23.25 $68.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BACKHOE/EXCAVATOR/TRACKHOE $35.02 $21.94 $56.96 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BULLDOZER; FORKLIFT; LOADER $34.70 $21.94 $56.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- LOADER WITH OR WITHOUT ATTACHMENTS; FORKLIFT; PAVER; ROLLER $32.62 $21.94 $54.56 $0.00 $0.00 $0.00 $0.00
ROOFER $32.50 $15.53 $48.03 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.38 $24.95 $64.33 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.99 $26.42 $72.41 $0.00 $0.00 $0.00 $0.00
TILE SETTER $37.44 $19.12 $56.56 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 $0.00 $0.00 $0.00 $0.00
View all WDs for Dallas → Revision history →