Wage Determination FL20260073-16476-res

Martin, FL · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260073-16476-res covers 35 trade classifications for residential construction in Martin, FL. Total packages (base + fringe) range from $9.00/hr to $55.45/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260073-16476-res
Revision: 1
Type: residential
County: Martin
State: FL
Effective: May 17, 2026
Trades covered: 35
Highest rate: $55.45/hr
Official source: SAM.gov reference FL20260073View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 $0.00 $0.00 $0.00 $0.00
CARPENTER $14.89 $0.00 $14.89 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.19 $0.00 $16.19 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $15.20 $55.45 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.65 $0.00 $9.65 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $9.15 $0.00 $9.15 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.46 $0.00 $10.46 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.79 $0.00 $11.79 $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $11.63 $0.00 $11.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $27.00 $14.90 $41.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.67 $0.00 $13.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.57 $14.90 $52.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.38 $14.90 $54.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.40 $14.90 $55.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.07 $14.90 $51.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.48 $0.00 $16.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.53 $14.90 $42.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.62 $0.00 $10.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $15.68 $0.00 $15.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $23.84 $14.75 $38.59 $0.00 $0.00 $0.00 $0.00
PLUMBER $25.00 $1.17 $26.17 $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $14.50 $0.00 $14.50 $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION $29.10 $14.68 $43.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.22 $0.00 $10.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 $0.00 $0.00 $0.00 $0.00
View all WDs for Martin → Revision history →