TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE SITE WORK — Prevailing Wage Rates
Davis-Bacon prevailing wages for TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE SITE WORKs across all covered states and counties. Rates vary by location and construction type.
Across 10 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE SITE WORK is $59.56/hr, with the middle 80% of counties paying between $59.56 and $59.56/hr. The highest state average is New York at $59.56/hr; the lowest is New York at $59.56/hr.
Range: $59.56 – $59.56/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 53-3032 — Heavy and Tractor-Trailer Truck Drivers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
10 county-level rates for TRUCK DRIVERS: GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT SHERE NOT SELF-LOADED. HAZARDOUS WASTE SITE WORK, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Livingston | NY | building | $31.79 | $27.77 | $59.56 | WD → |
| Livingston | NY | heavy | $31.79 | $27.77 | $59.56 | WD → |
| Livingston | NY | highway | $31.79 | $27.77 | $59.56 | WD → |
| Monroe | NY | building | $31.79 | $27.77 | $59.56 | WD → |
| Monroe | NY | heavy | $31.79 | $27.77 | $59.56 | WD → |
| Monroe | NY | highway | $31.79 | $27.77 | $59.56 | WD → |
| Orleans | NY | building | $31.79 | $27.77 | $59.56 | WD → |
| Orleans | NY | heavy | $31.79 | $27.77 | $59.56 | WD → |
| Orleans | NY | highway | $31.79 | $27.77 | $59.56 | WD → |
| Wyoming | NY | highway | $31.79 | $27.77 | $59.56 | WD → |