TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s — Prevailing Wage Rates
Davis-Bacon prevailing wages for TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or ss across all covered states and counties. Rates vary by location and construction type.
Across 306 Davis-Bacon rate records nationwide, the median total package (base + fringe) for TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s is $71.42/hr, with the middle 80% of counties paying between $68.10 and $71.65/hr. The highest state average is Illinois at $70.96/hr; the lowest is Illinois at $70.96/hr.
Range: $68.10 – $71.65/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 53-3032 — Heavy and Tractor-Trailer Truck Drivers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
306 county-level rates for TRUCK DRIVER, GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks; Vactor Trucks or s, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Adams | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Adams | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Adams | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Alexander | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Alexander | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Alexander | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Alexander | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Alexander | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Alexander | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Bond | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Bond | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Bond | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Boone | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Boone | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Boone | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Brown | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Brown | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Brown | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Bureau | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Bureau | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Bureau | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Calhoun | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Calhoun | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Calhoun | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Carroll | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Carroll | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Carroll | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Cass | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Cass | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Cass | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Clay | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Clay | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Clay | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Clay | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Clay | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Clay | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Clinton | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Clinton | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Clinton | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Crawford | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Crawford | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Crawford | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Crawford | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Crawford | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Crawford | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| De Kalb | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| De Kalb | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| De Kalb | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Edwards | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Edwards | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Edwards | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Edwards | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Edwards | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Edwards | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Effingham | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Effingham | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Effingham | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Effingham | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Effingham | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Effingham | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Fayette | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Fayette | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Fayette | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Fayette | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Fayette | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Fayette | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Franklin | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Franklin | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Franklin | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Franklin | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Franklin | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Franklin | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Fulton | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Fulton | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Fulton | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Gallatin | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Gallatin | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Gallatin | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Gallatin | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Gallatin | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Gallatin | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Greene | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Greene | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Greene | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Hamilton | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Hamilton | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Hamilton | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Hamilton | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Hamilton | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Hamilton | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Hancock | IL | building | $43.83 | $24.27 | $68.10 | WD → |
| Hancock | IL | building | $45.93 | $25.72 | $71.65 | WD → |
| Hancock | IL | building | $45.88 | $25.42 | $71.30 | WD → |
| Hardin | IL | heavy | $43.86 | $27.56 | $71.42 | WD → |
| Hardin | IL | highway | $45.88 | $25.42 | $71.30 | WD → |
| Hardin | IL | heavy | $45.88 | $25.42 | $71.30 | WD → |
| Hardin | IL | heavy | $45.93 | $25.72 | $71.65 | WD → |
| Hardin | IL | highway | $45.93 | $25.72 | $71.65 | WD → |
| Hardin | IL | highway | $43.86 | $27.56 | $71.42 | WD → |
| Henderson | IL | building | $43.83 | $24.27 | $68.10 | WD → |