POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHIs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 178 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI is $65.31/hr, with the middle 80% of counties paying between $65.31 and $65.31/hr. The highest state average is Indiana at $65.31/hr; the lowest is Indiana at $65.31/hr.

Bottom 10%
$65.31
Median
$65.31
Average
$65.31
Top 10%
$65.31

Range: $65.31 – $65.31/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$65.31/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+131.3%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $41.96/hr
Avg total: $65.31/hr
178 rates

All Rates

178 county-level rates for POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Miami IN heavy $41.96 $23.35 $65.31 WD →
Miami IN highway $41.96 $23.35 $65.31 WD →
Monroe IN heavy $41.96 $23.35 $65.31 WD →
Monroe IN highway $41.96 $23.35 $65.31 WD →
Montgomery IN highway $41.96 $23.35 $65.31 WD →
Montgomery IN heavy $41.96 $23.35 $65.31 WD →
Morgan IN heavy $41.96 $23.35 $65.31 WD →
Morgan IN highway $41.96 $23.35 $65.31 WD →
Newton IN heavy $41.96 $23.35 $65.31 WD →
Newton IN highway $41.96 $23.35 $65.31 WD →
Noble IN highway $41.96 $23.35 $65.31 WD →
Noble IN heavy $41.96 $23.35 $65.31 WD →
Ohio IN heavy $41.96 $23.35 $65.31 WD →
Ohio IN highway $41.96 $23.35 $65.31 WD →
Orange IN heavy $41.96 $23.35 $65.31 WD →
Orange IN highway $41.96 $23.35 $65.31 WD →
Owen IN highway $41.96 $23.35 $65.31 WD →
Owen IN heavy $41.96 $23.35 $65.31 WD →
Parke IN heavy $41.96 $23.35 $65.31 WD →
Parke IN highway $41.96 $23.35 $65.31 WD →
Perry IN highway $41.96 $23.35 $65.31 WD →
Perry IN heavy $41.96 $23.35 $65.31 WD →
Pike IN heavy $41.96 $23.35 $65.31 WD →
Pike IN highway $41.96 $23.35 $65.31 WD →
Posey IN heavy $41.96 $23.35 $65.31 WD →
Posey IN highway $41.96 $23.35 $65.31 WD →
Pulaski IN heavy $41.96 $23.35 $65.31 WD →
Pulaski IN highway $41.96 $23.35 $65.31 WD →
Putnam IN heavy $41.96 $23.35 $65.31 WD →
Putnam IN highway $41.96 $23.35 $65.31 WD →
Randolph IN heavy $41.96 $23.35 $65.31 WD →
Randolph IN highway $41.96 $23.35 $65.31 WD →
Ripley IN heavy $41.96 $23.35 $65.31 WD →
Ripley IN highway $41.96 $23.35 $65.31 WD →
Rush IN heavy $41.96 $23.35 $65.31 WD →
Rush IN highway $41.96 $23.35 $65.31 WD →
Scott IN heavy $41.96 $23.35 $65.31 WD →
Scott IN highway $41.96 $23.35 $65.31 WD →
Shelby IN heavy $41.96 $23.35 $65.31 WD →
Shelby IN highway $41.96 $23.35 $65.31 WD →
Spencer IN heavy $41.96 $23.35 $65.31 WD →
Spencer IN highway $41.96 $23.35 $65.31 WD →
Starke IN heavy $41.96 $23.35 $65.31 WD →
Starke IN highway $41.96 $23.35 $65.31 WD →
Steuben IN highway $41.96 $23.35 $65.31 WD →
Steuben IN heavy $41.96 $23.35 $65.31 WD →
Sullivan IN highway $41.96 $23.35 $65.31 WD →
Sullivan IN heavy $41.96 $23.35 $65.31 WD →
Switzerland IN heavy $41.96 $23.35 $65.31 WD →
Switzerland IN highway $41.96 $23.35 $65.31 WD →
Tippecanoe IN heavy $41.96 $23.35 $65.31 WD →
Tippecanoe IN highway $41.96 $23.35 $65.31 WD →
Tipton IN heavy $41.96 $23.35 $65.31 WD →
Tipton IN highway $41.96 $23.35 $65.31 WD →
Union IN highway $41.96 $23.35 $65.31 WD →
Union IN heavy $41.96 $23.35 $65.31 WD →
Vanderburgh IN heavy $41.96 $23.35 $65.31 WD →
Vanderburgh IN highway $41.96 $23.35 $65.31 WD →
Vermillion IN heavy $41.96 $23.35 $65.31 WD →
Vermillion IN highway $41.96 $23.35 $65.31 WD →
Vigo IN heavy $41.96 $23.35 $65.31 WD →
Vigo IN highway $41.96 $23.35 $65.31 WD →
Wabash IN heavy $41.96 $23.35 $65.31 WD →
Wabash IN highway $41.96 $23.35 $65.31 WD →
Warren IN heavy $41.96 $23.35 $65.31 WD →
Warren IN highway $41.96 $23.35 $65.31 WD →
Warrick IN heavy $41.96 $23.35 $65.31 WD →
Warrick IN highway $41.96 $23.35 $65.31 WD →
Washington IN highway $41.96 $23.35 $65.31 WD →
Washington IN heavy $41.96 $23.35 $65.31 WD →
Wayne IN heavy $41.96 $23.35 $65.31 WD →
Wayne IN highway $41.96 $23.35 $65.31 WD →
Wells IN heavy $41.96 $23.35 $65.31 WD →
Wells IN highway $41.96 $23.35 $65.31 WD →
White IN heavy $41.96 $23.35 $65.31 WD →
White IN highway $41.96 $23.35 $65.31 WD →
Whitley IN heavy $41.96 $23.35 $65.31 WD →
Whitley IN highway $41.96 $23.35 $65.31 WD →
Top-paying counties for POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI →