POWER EQUIPMENT OPERATOR Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and aboves across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 51 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above is $39.35/hr, with the middle 80% of counties paying between $39.35 and $39.35/hr. The highest state average is Texas at $39.35/hr; the lowest is Texas at $39.35/hr.

Bottom 10%
$39.35
Median
$39.35
Average
$39.35
Top 10%
$39.35

Range: $39.35 – $39.35/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$39.35/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+39.4%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Texas TX
Avg base: $28.75/hr
Avg total: $39.35/hr
51 rates

All Rates

51 county-level rates for POWER EQUIPMENT OPERATOR Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aransas TX building $28.75 $10.60 $39.35 WD →
Archer TX building $28.75 $10.60 $39.35 WD →
Armstrong TX building $28.75 $10.60 $39.35 WD →
Bell TX building $28.75 $10.60 $39.35 WD →
Bowie TX building $28.75 $10.60 $39.35 WD →
Brazos TX building $28.75 $10.60 $39.35 WD →
Burleson TX building $28.75 $10.60 $39.35 WD →
Calhoun TX building $28.75 $10.60 $39.35 WD →
Callahan TX building $28.75 $10.60 $39.35 WD →
Cameron TX building $28.75 $10.60 $39.35 WD →
Carson TX building $28.75 $10.60 $39.35 WD →
Clay TX building $28.75 $10.60 $39.35 WD →
Collin TX building $28.75 $10.60 $39.35 WD →
Coryell TX building $28.75 $10.60 $39.35 WD →
Crosby TX building $28.75 $10.60 $39.35 WD →
Dallas TX building $28.75 $10.60 $39.35 WD →
Delta TX building $28.75 $10.60 $39.35 WD →
Denton TX building $28.75 $10.60 $39.35 WD →
Ector TX building $28.75 $10.60 $39.35 WD →
El Paso TX building $28.75 $10.60 $39.35 WD →
Ellis TX building $28.75 $10.60 $39.35 WD →
Goliad TX building $28.75 $10.60 $39.35 WD →
Grayson TX building $28.75 $10.60 $39.35 WD →
Gregg TX building $28.75 $10.60 $39.35 WD →
Hidalgo TX building $28.75 $10.60 $39.35 WD →
Hunt TX building $28.75 $10.60 $39.35 WD →
Irion TX building $28.75 $10.60 $39.35 WD →
Johnson TX building $28.75 $10.60 $39.35 WD →
Jones TX building $28.75 $10.60 $39.35 WD →
Kaufman TX building $28.75 $10.60 $39.35 WD →
Lampasas TX building $28.75 $10.60 $39.35 WD →
Lubbock TX building $28.75 $10.60 $39.35 WD →
McLennan TX building $28.75 $10.60 $39.35 WD →
Midland TX building $28.75 $10.60 $39.35 WD →
Nueces TX building $28.75 $10.60 $39.35 WD →
Parker TX building $28.75 $10.60 $39.35 WD →
Potter TX building $28.75 $10.60 $39.35 WD →
Randall TX building $28.75 $10.60 $39.35 WD →
Robertson TX building $28.75 $10.60 $39.35 WD →
Rockwall TX building $28.75 $10.60 $39.35 WD →
Rusk TX building $28.75 $10.60 $39.35 WD →
San Patricio TX building $28.75 $10.60 $39.35 WD →
Smith TX building $28.75 $10.60 $39.35 WD →
Tarrant TX building $28.75 $10.60 $39.35 WD →
Taylor TX building $28.75 $10.60 $39.35 WD →
Tom Green TX building $28.75 $10.60 $39.35 WD →
Upshur TX building $28.75 $10.60 $39.35 WD →
Victoria TX building $28.75 $10.60 $39.35 WD →
Webb TX building $28.75 $10.60 $39.35 WD →
Wichita TX building $28.75 $10.60 $39.35 WD →
Wise TX building $28.75 $10.60 $39.35 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above →