Wage Determination TX20260288-14833-bld

Nueces, TX · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination TX20260288-14833-bld covers 37 trade classifications for building construction in Nueces, TX. Total packages (base + fringe) range from $9.68/hr to $58.09/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: TX20260288-14833-bld
Revision: 1
Type: building
County: Nueces
State: TX
Effective: May 17, 2026
Trades covered: 37
Highest rate: $58.09/hr
Official source: SAM.gov reference TX20260288View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.17 $24.92 $58.09 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.04 $0.00 $20.04 $0.00 $0.00 $0.00 $0.00
CARPENTER $15.21 $0.00 $15.21 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.33 $0.00 $15.33 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.80 $8.97 $39.77 $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $19.77 $7.13 $26.90 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.27 $0.00 $12.27 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.16 $5.26 $27.42 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.68 $0.00 $9.68 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.36 $0.00 $11.36 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.58 $0.00 $10.58 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.49 $2.13 $14.62 $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.25 $0.00 $14.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.29 $1.31 $19.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.83 $0.00 $14.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $13.37 $0.00 $13.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.55 $0.94 $14.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.70 $0.00 $12.70 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $14.45 $0.00 $14.45 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $25.80 $8.55 $34.35 $0.00 $0.00 $0.00 $0.00
PLUMBER $25.64 $8.16 $33.80 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 $0.00 $0.00 $0.00 $0.00
ROOFER $13.75 $0.00 $13.75 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.13 6.53 SHEET METAL WORKER $22.73 $7.52 $30.25 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.74 $0.00 $14.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 $0.00 $0.00 $0.00 $0.00
View all WDs for Nueces → Revision history →