POWER EQUIPMENT OPERATOR CONCRETE PUMP — Prevailing Wage Rates

Davis-Bacon prevailing wages for POWER EQUIPMENT OPERATOR CONCRETE PUMPs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 42 Davis-Bacon rate records nationwide, the median total package (base + fringe) for POWER EQUIPMENT OPERATOR CONCRETE PUMP is $46.55/hr, with the middle 80% of counties paying between $44.57 and $52.17/hr. The highest state average is Maryland at $47.97/hr; the lowest is Maryland at $47.97/hr.

Bottom 10%
$44.57
Median
$46.55
Average
$47.97
Top 10%
$52.17

Range: $42.96 – $52.72/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2073Operating Engineers and Other Construction Equipment Operators.

Davis-Bacon median
$46.55/hr
National median total package (base + fringe)
BLS OEWS market median
$28.23/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+64.9%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Maryland MD
Avg base: $34.21/hr
Avg total: $47.97/hr
42 rates

All Rates

42 county-level rates for POWER EQUIPMENT OPERATOR CONCRETE PUMP, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allegany MD building $36.02 $16.70 $52.72 WD →
Allegany MD heavy $35.47 $16.70 $52.17 WD →
Allegany MD highway $35.47 $16.70 $52.17 WD →
Anne Arundel MD heavy $33.00 $13.55 $46.55 WD →
Anne Arundel MD building $34.18 $14.62 $48.80 WD →
Anne Arundel MD highway $33.00 $13.55 $46.55 WD →
Baltimore MD building $44.35 $0.00 $44.35 WD →
Baltimore MD heavy $33.00 $13.55 $46.55 WD →
Baltimore MD highway $33.00 $13.55 $46.55 WD →
Baltimore City MD heavy $33.00 $13.55 $46.55 WD →
Baltimore City MD highway $33.00 $13.55 $46.55 WD →
Baltimore City MD building $34.18 $14.62 $48.80 WD →
Caroline MD building $34.18 $14.62 $48.80 WD →
Carroll MD building $34.18 $14.62 $48.80 WD →
Carroll MD highway $33.00 $13.55 $46.55 WD →
Carroll MD heavy $33.00 $13.55 $46.55 WD →
Cecil MD building $34.18 $14.62 $48.80 WD →
Charles MD building $30.46 $12.50 $42.96 WD →
Frederick MD highway $33.00 $13.55 $46.55 WD →
Frederick MD heavy $33.00 $13.55 $46.55 WD →
Frederick MD building $34.18 $14.62 $48.80 WD →
Garrett MD highway $35.47 $16.70 $52.17 WD →
Garrett MD building $36.02 $16.70 $52.72 WD →
Garrett MD heavy $35.47 $16.70 $52.17 WD →
Harford MD highway $33.00 $13.55 $46.55 WD →
Harford MD building $44.35 $0.00 $44.35 WD →
Harford MD heavy $33.00 $13.55 $46.55 WD →
Howard MD heavy $33.00 $13.55 $46.55 WD →
Howard MD highway $33.00 $13.55 $46.55 WD →
Howard MD building $34.18 $14.62 $48.80 WD →
Kent MD building $34.18 $14.62 $48.80 WD →
Montgomery MD building $30.46 $12.50 $42.96 WD →
Montgomery MD heavy $33.00 $13.55 $46.55 WD →
Montgomery MD highway $33.00 $13.55 $46.55 WD →
Prince George's MD building $30.46 $12.50 $42.96 WD →
Prince George's MD heavy $33.00 $13.55 $46.55 WD →
Prince George's MD highway $33.00 $13.55 $46.55 WD →
Queen Anne's MD building $34.18 $14.62 $48.80 WD →
Talbot MD building $34.18 $14.62 $48.80 WD →
Washington MD heavy $35.47 $16.70 $52.17 WD →
Washington MD building $36.02 $16.70 $52.72 WD →
Washington MD highway $35.47 $16.70 $52.17 WD →
Top-paying counties for POWER EQUIPMENT OPERATOR CONCRETE PUMP →