PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MA — Prevailing Wage Rates

Davis-Bacon prevailing wages for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MAs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 230 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MA is $68.65/hr, with the middle 80% of counties paying between $68.65 and $68.65/hr. The highest state average is Missouri at $68.65/hr; the lowest is Missouri at $68.65/hr.

Bottom 10%
$68.65
Median
$68.65
Average
$68.65
Top 10%
$68.65

Range: $68.65 – $68.65/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2152Plumbers, Pipefitters, and Steamfitters.

Davis-Bacon median
$68.65/hr
National median total package (base + fringe)
BLS OEWS market median
$30.27/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+126.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Missouri MO
Avg base: $46.66/hr
Avg total: $68.65/hr
230 rates

All Rates

230 county-level rates for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MA, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
St Louis MO heavy $46.66 $21.99 $68.65 WD →
St Louis MO highway $46.66 $21.99 $68.65 WD →
St Louis City MO highway $46.66 $21.99 $68.65 WD →
St Louis City MO heavy $46.66 $21.99 $68.65 WD →
Ste Genevieve MO heavy $46.66 $21.99 $68.65 WD →
Ste Genevieve MO highway $46.66 $21.99 $68.65 WD →
Stoddard MO heavy $46.66 $21.99 $68.65 WD →
Stoddard MO highway $46.66 $21.99 $68.65 WD →
Stone MO highway $46.66 $21.99 $68.65 WD →
Stone MO heavy $46.66 $21.99 $68.65 WD →
Sullivan MO heavy $46.66 $21.99 $68.65 WD →
Sullivan MO highway $46.66 $21.99 $68.65 WD →
Taney MO heavy $46.66 $21.99 $68.65 WD →
Taney MO highway $46.66 $21.99 $68.65 WD →
Texas MO heavy $46.66 $21.99 $68.65 WD →
Texas MO highway $46.66 $21.99 $68.65 WD →
Vernon MO highway $46.66 $21.99 $68.65 WD →
Vernon MO heavy $46.66 $21.99 $68.65 WD →
Warren MO heavy $46.66 $21.99 $68.65 WD →
Warren MO highway $46.66 $21.99 $68.65 WD →
Washington MO heavy $46.66 $21.99 $68.65 WD →
Washington MO highway $46.66 $21.99 $68.65 WD →
Wayne MO highway $46.66 $21.99 $68.65 WD →
Wayne MO heavy $46.66 $21.99 $68.65 WD →
Webster MO highway $46.66 $21.99 $68.65 WD →
Webster MO heavy $46.66 $21.99 $68.65 WD →
Worth MO highway $46.66 $21.99 $68.65 WD →
Worth MO heavy $46.66 $21.99 $68.65 WD →
Wright MO highway $46.66 $21.99 $68.65 WD →
Wright MO heavy $46.66 $21.99 $68.65 WD →
Top-paying counties for PLUMBERS: MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER (CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MA →