PLASTERER 4-stories — Prevailing Wage Rates

Davis-Bacon prevailing wages for PLASTERER 4-storiess across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 8 Davis-Bacon rate records nationwide, the median total package (base + fringe) for PLASTERER 4-stories is $67.01/hr, with the middle 80% of counties paying between $67.01 and $67.01/hr. The highest state average is California at $67.01/hr; the lowest is California at $67.01/hr.

Bottom 10%
$67.01
Median
$67.01
Average
$67.01
Top 10%
$67.01

Range: $67.01 – $67.01/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2161Plasterers and Stucco Masons.

Davis-Bacon median
$67.01/hr
National median total package (base + fringe)
BLS OEWS market median
$26.93/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+148.8%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $47.37/hr
Avg total: $67.01/hr
8 rates

All Rates

8 county-level rates for PLASTERER 4-stories, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Imperial CA residential $47.37 $19.64 $67.01 WD →
Los Angeles CA residential $47.37 $19.64 $67.01 WD →
Orange CA residential $47.37 $19.64 $67.01 WD →
Riverside CA residential $47.37 $19.64 $67.01 WD →
San Bernardino CA residential $47.37 $19.64 $67.01 WD →
San Luis Obispo CA residential $47.37 $19.64 $67.01 WD →
Santa Barbara CA residential $47.37 $19.64 $67.01 WD →
Ventura CA residential $47.37 $19.64 $67.01 WD →
Top-paying counties for PLASTERER 4-stories →