OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISESs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 500 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES is $92.43/hr, with the middle 80% of counties paying between $90.72 and $94.33/hr. The highest state average is California at $92.48/hr; the lowest is California at $92.48/hr.

Bottom 10%
$90.72
Median
$92.43
Average
$92.48
Top 10%
$94.33

Range: $90.72 – $94.33/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $59.95/hr
Avg total: $92.48/hr
500 rates

All Rates

500 county-level rates for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA building $59.33 $32.53 $91.86 WD →
Alameda CA building $58.19 $32.53 $90.72 WD →
Alameda CA highway $58.19 $32.53 $90.72 WD →
Alameda CA highway $61.80 $32.53 $94.33 WD →
Alameda CA building $61.80 $32.53 $94.33 WD →
Alameda CA building $60.47 $32.53 $93.00 WD →
Alameda CA heavy $61.80 $32.53 $94.33 WD →
Alameda CA heavy $60.47 $32.53 $93.00 WD →
Alameda CA heavy $58.19 $32.53 $90.72 WD →
Alameda CA highway $59.33 $32.53 $91.86 WD →
Alameda CA highway $60.47 $32.53 $93.00 WD →
Alameda CA heavy $59.33 $32.53 $91.86 WD →
Alpine CA highway $60.47 $32.53 $93.00 WD →
Alpine CA highway $59.33 $32.53 $91.86 WD →
Alpine CA heavy $59.33 $32.53 $91.86 WD →
Alpine CA building $60.47 $32.53 $93.00 WD →
Alpine CA building $61.80 $32.53 $94.33 WD →
Alpine CA building $59.33 $32.53 $91.86 WD →
Alpine CA heavy $61.80 $32.53 $94.33 WD →
Alpine CA building $58.19 $32.53 $90.72 WD →
Alpine CA highway $61.80 $32.53 $94.33 WD →
Alpine CA highway $58.19 $32.53 $90.72 WD →
Alpine CA heavy $60.47 $32.53 $93.00 WD →
Alpine CA heavy $58.19 $32.53 $90.72 WD →
Amador CA heavy $58.19 $32.53 $90.72 WD →
Amador CA highway $61.80 $32.53 $94.33 WD →
Amador CA heavy $60.47 $32.53 $93.00 WD →
Amador CA highway $58.19 $32.53 $90.72 WD →
Amador CA highway $59.33 $32.53 $91.86 WD →
Amador CA heavy $59.33 $32.53 $91.86 WD →
Amador CA building $61.80 $32.53 $94.33 WD →
Amador CA highway $60.47 $32.53 $93.00 WD →
Amador CA building $58.19 $32.53 $90.72 WD →
Amador CA building $60.47 $32.53 $93.00 WD →
Amador CA heavy $61.80 $32.53 $94.33 WD →
Amador CA building $59.33 $32.53 $91.86 WD →
Butte CA highway $58.19 $32.53 $90.72 WD →
Butte CA building $59.33 $32.53 $91.86 WD →
Butte CA highway $59.33 $32.53 $91.86 WD →
Butte CA highway $60.47 $32.53 $93.00 WD →
Butte CA building $58.19 $32.53 $90.72 WD →
Butte CA heavy $59.33 $32.53 $91.86 WD →
Butte CA building $61.80 $32.53 $94.33 WD →
Butte CA highway $61.80 $32.53 $94.33 WD →
Butte CA heavy $58.19 $32.53 $90.72 WD →
Butte CA heavy $61.80 $32.53 $94.33 WD →
Butte CA heavy $60.47 $32.53 $93.00 WD →
Butte CA building $60.47 $32.53 $93.00 WD →
Calaveras CA highway $58.19 $32.53 $90.72 WD →
Calaveras CA building $61.80 $32.53 $94.33 WD →
Calaveras CA building $58.19 $32.53 $90.72 WD →
Calaveras CA building $60.47 $32.53 $93.00 WD →
Calaveras CA building $59.33 $32.53 $91.86 WD →
Calaveras CA heavy $58.19 $32.53 $90.72 WD →
Calaveras CA heavy $59.33 $32.53 $91.86 WD →
Calaveras CA heavy $60.47 $32.53 $93.00 WD →
Calaveras CA highway $61.80 $32.53 $94.33 WD →
Calaveras CA heavy $61.80 $32.53 $94.33 WD →
Calaveras CA highway $59.33 $32.53 $91.86 WD →
Calaveras CA highway $60.47 $32.53 $93.00 WD →
Colusa CA heavy $58.19 $32.53 $90.72 WD →
Colusa CA heavy $59.33 $32.53 $91.86 WD →
Colusa CA heavy $60.47 $32.53 $93.00 WD →
Colusa CA building $61.80 $32.53 $94.33 WD →
Colusa CA building $58.19 $32.53 $90.72 WD →
Colusa CA highway $59.33 $32.53 $91.86 WD →
Colusa CA building $59.33 $32.53 $91.86 WD →
Colusa CA highway $58.19 $32.53 $90.72 WD →
Colusa CA highway $60.47 $32.53 $93.00 WD →
Colusa CA building $60.47 $32.53 $93.00 WD →
Colusa CA heavy $61.80 $32.53 $94.33 WD →
Colusa CA highway $61.80 $32.53 $94.33 WD →
Contra Costa CA building $60.47 $32.53 $93.00 WD →
Contra Costa CA heavy $60.47 $32.53 $93.00 WD →
Contra Costa CA building $59.33 $32.53 $91.86 WD →
Contra Costa CA building $58.19 $32.53 $90.72 WD →
Contra Costa CA heavy $61.80 $32.53 $94.33 WD →
Contra Costa CA heavy $59.33 $32.53 $91.86 WD →
Contra Costa CA heavy $58.19 $32.53 $90.72 WD →
Contra Costa CA highway $60.47 $32.53 $93.00 WD →
Contra Costa CA highway $58.19 $32.53 $90.72 WD →
Contra Costa CA highway $59.33 $32.53 $91.86 WD →
Contra Costa CA highway $61.80 $32.53 $94.33 WD →
Contra Costa CA building $61.80 $32.53 $94.33 WD →
El Dorado CA building $60.47 $32.53 $93.00 WD →
El Dorado CA building $61.80 $32.53 $94.33 WD →
El Dorado CA highway $60.47 $32.53 $93.00 WD →
El Dorado CA highway $61.80 $32.53 $94.33 WD →
El Dorado CA building $58.19 $32.53 $90.72 WD →
El Dorado CA highway $58.19 $32.53 $90.72 WD →
El Dorado CA building $59.33 $32.53 $91.86 WD →
El Dorado CA heavy $59.33 $32.53 $91.86 WD →
El Dorado CA heavy $60.47 $32.53 $93.00 WD →
El Dorado CA heavy $58.19 $32.53 $90.72 WD →
El Dorado CA heavy $61.80 $32.53 $94.33 WD →
El Dorado CA highway $59.33 $32.53 $91.86 WD →
Fresno CA highway $61.80 $32.53 $94.33 WD →
Fresno CA building $60.47 $32.53 $93.00 WD →
Fresno CA highway $59.33 $32.53 $91.86 WD →
Fresno CA highway $60.47 $32.53 $93.00 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES →