OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO — Prevailing Wage Rates
Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROs across all covered states and counties. Rates vary by location and construction type.
Across 125 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO is $95.59/hr, with the middle 80% of counties paying between $95.59 and $95.59/hr. The highest state average is California at $95.59/hr; the lowest is California at $95.59/hr.
Range: $95.59 – $95.59/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
125 county-level rates for OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Sonoma | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Sonoma | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Stanislaus | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Stanislaus | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Stanislaus | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Sutter | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Sutter | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Sutter | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Tehama | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Tehama | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Tehama | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Trinity | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Trinity | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Trinity | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Tulare | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Tulare | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Tuolumne | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Tuolumne | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Tuolumne | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Yolo | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Yolo | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Yolo | CA | building | $63.06 | $32.53 | $95.59 | WD → |
| Yuba | CA | highway | $63.06 | $32.53 | $95.59 | WD → |
| Yuba | CA | heavy | $63.06 | $32.53 | $95.59 | WD → |
| Yuba | CA | building | $63.06 | $32.53 | $95.59 | WD → |