OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 123 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 is $94.77/hr, with the middle 80% of counties paying between $94.77 and $94.77/hr. The highest state average is California at $94.77/hr; the lowest is California at $94.77/hr.

Bottom 10%
$94.77
Median
$94.77
Average
$94.77
Top 10%
$94.77

Range: $94.77 – $94.77/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $62.24/hr
Avg total: $94.77/hr
123 rates

All Rates

123 county-level rates for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA building $62.24 $32.53 $94.77 WD →
Alameda CA heavy $62.24 $32.53 $94.77 WD →
Alameda CA highway $62.24 $32.53 $94.77 WD →
Alpine CA building $62.24 $32.53 $94.77 WD →
Alpine CA highway $62.24 $32.53 $94.77 WD →
Alpine CA heavy $62.24 $32.53 $94.77 WD →
Amador CA heavy $62.24 $32.53 $94.77 WD →
Amador CA highway $62.24 $32.53 $94.77 WD →
Amador CA building $62.24 $32.53 $94.77 WD →
Butte CA building $62.24 $32.53 $94.77 WD →
Butte CA heavy $62.24 $32.53 $94.77 WD →
Butte CA highway $62.24 $32.53 $94.77 WD →
Calaveras CA highway $62.24 $32.53 $94.77 WD →
Calaveras CA heavy $62.24 $32.53 $94.77 WD →
Calaveras CA building $62.24 $32.53 $94.77 WD →
Colusa CA building $62.24 $32.53 $94.77 WD →
Colusa CA heavy $62.24 $32.53 $94.77 WD →
Colusa CA highway $62.24 $32.53 $94.77 WD →
Contra Costa CA building $62.24 $32.53 $94.77 WD →
Contra Costa CA highway $62.24 $32.53 $94.77 WD →
Contra Costa CA heavy $62.24 $32.53 $94.77 WD →
El Dorado CA highway $62.24 $32.53 $94.77 WD →
El Dorado CA heavy $62.24 $32.53 $94.77 WD →
El Dorado CA building $62.24 $32.53 $94.77 WD →
Fresno CA highway $62.24 $32.53 $94.77 WD →
Fresno CA heavy $62.24 $32.53 $94.77 WD →
Fresno CA building $62.24 $32.53 $94.77 WD →
Glenn CA highway $62.24 $32.53 $94.77 WD →
Glenn CA building $62.24 $32.53 $94.77 WD →
Glenn CA heavy $62.24 $32.53 $94.77 WD →
Kings CA heavy $62.24 $32.53 $94.77 WD →
Kings CA highway $62.24 $32.53 $94.77 WD →
Kings CA building $62.24 $32.53 $94.77 WD →
Lassen CA heavy $62.24 $32.53 $94.77 WD →
Lassen CA building $62.24 $32.53 $94.77 WD →
Lassen CA highway $62.24 $32.53 $94.77 WD →
Madera CA heavy $62.24 $32.53 $94.77 WD →
Madera CA highway $62.24 $32.53 $94.77 WD →
Madera CA building $62.24 $32.53 $94.77 WD →
Marin CA building $62.24 $32.53 $94.77 WD →
Marin CA heavy $62.24 $32.53 $94.77 WD →
Marin CA highway $62.24 $32.53 $94.77 WD →
Mariposa CA heavy $62.24 $32.53 $94.77 WD →
Mariposa CA highway $62.24 $32.53 $94.77 WD →
Mariposa CA building $62.24 $32.53 $94.77 WD →
Merced CA heavy $62.24 $32.53 $94.77 WD →
Merced CA highway $62.24 $32.53 $94.77 WD →
Merced CA building $62.24 $32.53 $94.77 WD →
Modoc CA building $62.24 $32.53 $94.77 WD →
Modoc CA highway $62.24 $32.53 $94.77 WD →
Modoc CA heavy $62.24 $32.53 $94.77 WD →
Monterey CA building $62.24 $32.53 $94.77 WD →
Monterey CA highway $62.24 $32.53 $94.77 WD →
Monterey CA heavy $62.24 $32.53 $94.77 WD →
Napa CA highway $62.24 $32.53 $94.77 WD →
Napa CA building $62.24 $32.53 $94.77 WD →
Napa CA heavy $62.24 $32.53 $94.77 WD →
Nevada CA heavy $62.24 $32.53 $94.77 WD →
Nevada CA highway $62.24 $32.53 $94.77 WD →
Nevada CA building $62.24 $32.53 $94.77 WD →
Placer CA heavy $62.24 $32.53 $94.77 WD →
Placer CA building $62.24 $32.53 $94.77 WD →
Placer CA highway $62.24 $32.53 $94.77 WD →
Plumas CA heavy $62.24 $32.53 $94.77 WD →
Plumas CA highway $62.24 $32.53 $94.77 WD →
Plumas CA building $62.24 $32.53 $94.77 WD →
Sacramento CA heavy $62.24 $32.53 $94.77 WD →
Sacramento CA building $62.24 $32.53 $94.77 WD →
Sacramento CA highway $62.24 $32.53 $94.77 WD →
San Benito CA highway $62.24 $32.53 $94.77 WD →
San Benito CA building $62.24 $32.53 $94.77 WD →
San Benito CA heavy $62.24 $32.53 $94.77 WD →
San Francisco CA highway $62.24 $32.53 $94.77 WD →
San Francisco CA heavy $62.24 $32.53 $94.77 WD →
San Francisco CA building $62.24 $32.53 $94.77 WD →
San Joaquin CA heavy $62.24 $32.53 $94.77 WD →
San Joaquin CA building $62.24 $32.53 $94.77 WD →
San Joaquin CA highway $62.24 $32.53 $94.77 WD →
San Mateo CA heavy $62.24 $32.53 $94.77 WD →
San Mateo CA highway $62.24 $32.53 $94.77 WD →
San Mateo CA building $62.24 $32.53 $94.77 WD →
Santa Clara CA highway $62.24 $32.53 $94.77 WD →
Santa Clara CA building $62.24 $32.53 $94.77 WD →
Santa Clara CA heavy $62.24 $32.53 $94.77 WD →
Santa Cruz CA highway $62.24 $32.53 $94.77 WD →
Santa Cruz CA building $62.24 $32.53 $94.77 WD →
Santa Cruz CA heavy $62.24 $32.53 $94.77 WD →
Shasta CA heavy $62.24 $32.53 $94.77 WD →
Shasta CA highway $62.24 $32.53 $94.77 WD →
Shasta CA building $62.24 $32.53 $94.77 WD →
Sierra CA heavy $62.24 $32.53 $94.77 WD →
Sierra CA highway $62.24 $32.53 $94.77 WD →
Sierra CA building $62.24 $32.53 $94.77 WD →
Siskiyou CA heavy $62.24 $32.53 $94.77 WD →
Siskiyou CA building $62.24 $32.53 $94.77 WD →
Siskiyou CA highway $62.24 $32.53 $94.77 WD →
Solano CA highway $62.24 $32.53 $94.77 WD →
Solano CA heavy $62.24 $32.53 $94.77 WD →
Solano CA building $62.24 $32.53 $94.77 WD →
Sonoma CA highway $62.24 $32.53 $94.77 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 →