OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 — Prevailing Wage Rates

Davis-Bacon prevailing wages for OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4s across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 123 Davis-Bacon rate records nationwide, the median total package (base + fringe) for OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 is $93.83/hr, with the middle 80% of counties paying between $93.83 and $93.83/hr. The highest state average is California at $93.83/hr; the lowest is California at $93.83/hr.

Bottom 10%
$93.83
Median
$93.83
Average
$93.83
Top 10%
$93.83

Range: $93.83 – $93.83/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

California CA
Avg base: $61.30/hr
Avg total: $93.83/hr
123 rates

All Rates

123 county-level rates for OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA building $61.30 $32.53 $93.83 WD →
Alameda CA heavy $61.30 $32.53 $93.83 WD →
Alameda CA highway $61.30 $32.53 $93.83 WD →
Alpine CA building $61.30 $32.53 $93.83 WD →
Alpine CA highway $61.30 $32.53 $93.83 WD →
Alpine CA heavy $61.30 $32.53 $93.83 WD →
Amador CA heavy $61.30 $32.53 $93.83 WD →
Amador CA highway $61.30 $32.53 $93.83 WD →
Amador CA building $61.30 $32.53 $93.83 WD →
Butte CA building $61.30 $32.53 $93.83 WD →
Butte CA heavy $61.30 $32.53 $93.83 WD →
Butte CA highway $61.30 $32.53 $93.83 WD →
Calaveras CA highway $61.30 $32.53 $93.83 WD →
Calaveras CA heavy $61.30 $32.53 $93.83 WD →
Calaveras CA building $61.30 $32.53 $93.83 WD →
Colusa CA building $61.30 $32.53 $93.83 WD →
Colusa CA heavy $61.30 $32.53 $93.83 WD →
Colusa CA highway $61.30 $32.53 $93.83 WD →
Contra Costa CA building $61.30 $32.53 $93.83 WD →
Contra Costa CA highway $61.30 $32.53 $93.83 WD →
Contra Costa CA heavy $61.30 $32.53 $93.83 WD →
El Dorado CA highway $61.30 $32.53 $93.83 WD →
El Dorado CA heavy $61.30 $32.53 $93.83 WD →
El Dorado CA building $61.30 $32.53 $93.83 WD →
Fresno CA highway $61.30 $32.53 $93.83 WD →
Fresno CA heavy $61.30 $32.53 $93.83 WD →
Fresno CA building $61.30 $32.53 $93.83 WD →
Glenn CA highway $61.30 $32.53 $93.83 WD →
Glenn CA building $61.30 $32.53 $93.83 WD →
Glenn CA heavy $61.30 $32.53 $93.83 WD →
Kings CA heavy $61.30 $32.53 $93.83 WD →
Kings CA highway $61.30 $32.53 $93.83 WD →
Kings CA building $61.30 $32.53 $93.83 WD →
Lassen CA heavy $61.30 $32.53 $93.83 WD →
Lassen CA building $61.30 $32.53 $93.83 WD →
Lassen CA highway $61.30 $32.53 $93.83 WD →
Madera CA heavy $61.30 $32.53 $93.83 WD →
Madera CA highway $61.30 $32.53 $93.83 WD →
Madera CA building $61.30 $32.53 $93.83 WD →
Marin CA building $61.30 $32.53 $93.83 WD →
Marin CA heavy $61.30 $32.53 $93.83 WD →
Marin CA highway $61.30 $32.53 $93.83 WD →
Mariposa CA heavy $61.30 $32.53 $93.83 WD →
Mariposa CA highway $61.30 $32.53 $93.83 WD →
Mariposa CA building $61.30 $32.53 $93.83 WD →
Merced CA heavy $61.30 $32.53 $93.83 WD →
Merced CA highway $61.30 $32.53 $93.83 WD →
Merced CA building $61.30 $32.53 $93.83 WD →
Modoc CA building $61.30 $32.53 $93.83 WD →
Modoc CA highway $61.30 $32.53 $93.83 WD →
Modoc CA heavy $61.30 $32.53 $93.83 WD →
Monterey CA building $61.30 $32.53 $93.83 WD →
Monterey CA highway $61.30 $32.53 $93.83 WD →
Monterey CA heavy $61.30 $32.53 $93.83 WD →
Napa CA highway $61.30 $32.53 $93.83 WD →
Napa CA building $61.30 $32.53 $93.83 WD →
Napa CA heavy $61.30 $32.53 $93.83 WD →
Nevada CA heavy $61.30 $32.53 $93.83 WD →
Nevada CA highway $61.30 $32.53 $93.83 WD →
Nevada CA building $61.30 $32.53 $93.83 WD →
Placer CA heavy $61.30 $32.53 $93.83 WD →
Placer CA building $61.30 $32.53 $93.83 WD →
Placer CA highway $61.30 $32.53 $93.83 WD →
Plumas CA heavy $61.30 $32.53 $93.83 WD →
Plumas CA highway $61.30 $32.53 $93.83 WD →
Plumas CA building $61.30 $32.53 $93.83 WD →
Sacramento CA heavy $61.30 $32.53 $93.83 WD →
Sacramento CA building $61.30 $32.53 $93.83 WD →
Sacramento CA highway $61.30 $32.53 $93.83 WD →
San Benito CA highway $61.30 $32.53 $93.83 WD →
San Benito CA building $61.30 $32.53 $93.83 WD →
San Benito CA heavy $61.30 $32.53 $93.83 WD →
San Francisco CA highway $61.30 $32.53 $93.83 WD →
San Francisco CA heavy $61.30 $32.53 $93.83 WD →
San Francisco CA building $61.30 $32.53 $93.83 WD →
San Joaquin CA heavy $61.30 $32.53 $93.83 WD →
San Joaquin CA building $61.30 $32.53 $93.83 WD →
San Joaquin CA highway $61.30 $32.53 $93.83 WD →
San Mateo CA heavy $61.30 $32.53 $93.83 WD →
San Mateo CA highway $61.30 $32.53 $93.83 WD →
San Mateo CA building $61.30 $32.53 $93.83 WD →
Santa Clara CA highway $61.30 $32.53 $93.83 WD →
Santa Clara CA building $61.30 $32.53 $93.83 WD →
Santa Clara CA heavy $61.30 $32.53 $93.83 WD →
Santa Cruz CA highway $61.30 $32.53 $93.83 WD →
Santa Cruz CA building $61.30 $32.53 $93.83 WD →
Santa Cruz CA heavy $61.30 $32.53 $93.83 WD →
Shasta CA heavy $61.30 $32.53 $93.83 WD →
Shasta CA highway $61.30 $32.53 $93.83 WD →
Shasta CA building $61.30 $32.53 $93.83 WD →
Sierra CA heavy $61.30 $32.53 $93.83 WD →
Sierra CA highway $61.30 $32.53 $93.83 WD →
Sierra CA building $61.30 $32.53 $93.83 WD →
Siskiyou CA heavy $61.30 $32.53 $93.83 WD →
Siskiyou CA building $61.30 $32.53 $93.83 WD →
Siskiyou CA highway $61.30 $32.53 $93.83 WD →
Solano CA highway $61.30 $32.53 $93.83 WD →
Solano CA heavy $61.30 $32.53 $93.83 WD →
Solano CA building $61.30 $32.53 $93.83 WD →
Sonoma CA highway $61.30 $32.53 $93.83 WD →
Top-paying counties for OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 →