LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, Js across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 126 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J is $76.10/hr, with the middle 80% of counties paying between $76.10 and $76.10/hr. The highest state average is Illinois at $76.10/hr; the lowest is Illinois at $76.10/hr.

Bottom 10%
$76.10
Median
$76.10
Average
$76.10
Top 10%
$76.10

Range: $76.10 – $76.10/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$76.10/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+71%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Illinois IL
Avg base: $52.13/hr
Avg total: $76.10/hr
126 rates

All Rates

126 county-level rates for LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Saline IL heavy $52.13 $23.97 $76.10 WD →
Saline IL highway $52.13 $23.97 $76.10 WD →
Sangamon IL highway $52.13 $23.97 $76.10 WD →
Sangamon IL heavy $52.13 $23.97 $76.10 WD →
Schuyler IL heavy $52.13 $23.97 $76.10 WD →
Schuyler IL highway $52.13 $23.97 $76.10 WD →
Scott IL heavy $52.13 $23.97 $76.10 WD →
Scott IL highway $52.13 $23.97 $76.10 WD →
Shelby IL highway $52.13 $23.97 $76.10 WD →
Shelby IL heavy $52.13 $23.97 $76.10 WD →
St Clair IL heavy $52.13 $23.97 $76.10 WD →
St Clair IL highway $52.13 $23.97 $76.10 WD →
Union IL heavy $52.13 $23.97 $76.10 WD →
Union IL highway $52.13 $23.97 $76.10 WD →
Vermilion IL heavy $52.13 $23.97 $76.10 WD →
Vermilion IL highway $52.13 $23.97 $76.10 WD →
Wabash IL highway $52.13 $23.97 $76.10 WD →
Wabash IL heavy $52.13 $23.97 $76.10 WD →
Washington IL heavy $52.13 $23.97 $76.10 WD →
Washington IL highway $52.13 $23.97 $76.10 WD →
Wayne IL heavy $52.13 $23.97 $76.10 WD →
Wayne IL highway $52.13 $23.97 $76.10 WD →
White IL highway $52.13 $23.97 $76.10 WD →
White IL heavy $52.13 $23.97 $76.10 WD →
Williamson IL heavy $52.13 $23.97 $76.10 WD →
Williamson IL highway $52.13 $23.97 $76.10 WD →
Top-paying counties for LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE, GALLATIN, HAMILTON, HARDIN, J →