LINE CONSTRUCTION: EQUIPMENT OPERATORS — Prevailing Wage Rates

Davis-Bacon prevailing wages for LINE CONSTRUCTION: EQUIPMENT OPERATORSs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 8 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LINE CONSTRUCTION: EQUIPMENT OPERATORS is $38.88/hr, with the middle 80% of counties paying between $38.88 and $62.06/hr. The highest state average is District of Columbia at $62.06/hr; the lowest is Texas at $38.88/hr.

Bottom 10%
$38.88
Median
$38.88
Average
$44.68
Top 10%
$62.06

Range: $38.88 – $62.06/hr across 2 states. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 49-9051Electrical Power-Line Installers and Repairers.

Davis-Bacon median
$38.88/hr
National median total package (base + fringe)
BLS OEWS market median
$44.50/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-12.6%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

District of Columbia DC
Avg base: $44.56/hr
Avg total: $62.06/hr
2 rates
Texas TX
Avg base: $25.83/hr
Avg total: $38.88/hr
6 rates

All Rates

8 county-level rates for LINE CONSTRUCTION: EQUIPMENT OPERATORS, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Washington, D.C. DC heavy $44.56 $17.50 $62.06 WD →
Washington, D.C. DC highway $44.56 $17.50 $62.06 WD →
Collin TX heavy $25.83 $13.05 $38.88 WD →
Dallas TX heavy $25.83 $13.05 $38.88 WD →
Denton TX heavy $25.83 $13.05 $38.88 WD →
Ellis TX heavy $25.83 $13.05 $38.88 WD →
Kaufman TX heavy $25.83 $13.05 $38.88 WD →
Rockwall TX heavy $25.83 $13.05 $38.88 WD →
Top-paying counties for LINE CONSTRUCTION: EQUIPMENT OPERATORS →