LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAWs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 356 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW is $60.57/hr, with the middle 80% of counties paying between $59.18 and $61.95/hr. The highest state average is Indiana at $60.57/hr; the lowest is Indiana at $60.57/hr.

Bottom 10%
$59.18
Median
$60.57
Average
$60.57
Top 10%
$61.95

Range: $59.18 – $61.95/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$60.57/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+169.6%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Indiana IN
Avg base: $33.07/hr
Avg total: $60.57/hr
356 rates

All Rates

356 county-level rates for LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Tippecanoe IN highway $34.45 $27.50 $61.95 WD →
Tippecanoe IN heavy $31.68 $27.50 $59.18 WD →
Tippecanoe IN highway $31.68 $27.50 $59.18 WD →
Tippecanoe IN heavy $34.45 $27.50 $61.95 WD →
Tipton IN heavy $34.45 $27.50 $61.95 WD →
Tipton IN highway $31.68 $27.50 $59.18 WD →
Tipton IN highway $34.45 $27.50 $61.95 WD →
Tipton IN heavy $31.68 $27.50 $59.18 WD →
Union IN heavy $34.45 $27.50 $61.95 WD →
Union IN highway $31.68 $27.50 $59.18 WD →
Union IN highway $34.45 $27.50 $61.95 WD →
Union IN heavy $31.68 $27.50 $59.18 WD →
Vanderburgh IN heavy $31.68 $27.50 $59.18 WD →
Vanderburgh IN highway $34.45 $27.50 $61.95 WD →
Vanderburgh IN highway $31.68 $27.50 $59.18 WD →
Vanderburgh IN heavy $34.45 $27.50 $61.95 WD →
Vermillion IN highway $31.68 $27.50 $59.18 WD →
Vermillion IN heavy $31.68 $27.50 $59.18 WD →
Vermillion IN highway $34.45 $27.50 $61.95 WD →
Vermillion IN heavy $34.45 $27.50 $61.95 WD →
Vigo IN highway $34.45 $27.50 $61.95 WD →
Vigo IN highway $31.68 $27.50 $59.18 WD →
Vigo IN heavy $31.68 $27.50 $59.18 WD →
Vigo IN heavy $34.45 $27.50 $61.95 WD →
Wabash IN highway $34.45 $27.50 $61.95 WD →
Wabash IN heavy $31.68 $27.50 $59.18 WD →
Wabash IN highway $31.68 $27.50 $59.18 WD →
Wabash IN heavy $34.45 $27.50 $61.95 WD →
Warren IN heavy $34.45 $27.50 $61.95 WD →
Warren IN highway $34.45 $27.50 $61.95 WD →
Warren IN highway $31.68 $27.50 $59.18 WD →
Warren IN heavy $31.68 $27.50 $59.18 WD →
Warrick IN highway $31.68 $27.50 $59.18 WD →
Warrick IN heavy $31.68 $27.50 $59.18 WD →
Warrick IN highway $34.45 $27.50 $61.95 WD →
Warrick IN heavy $34.45 $27.50 $61.95 WD →
Washington IN heavy $34.45 $27.50 $61.95 WD →
Washington IN heavy $31.68 $27.50 $59.18 WD →
Washington IN highway $34.45 $27.50 $61.95 WD →
Washington IN highway $31.68 $27.50 $59.18 WD →
Wayne IN heavy $31.68 $27.50 $59.18 WD →
Wayne IN highway $31.68 $27.50 $59.18 WD →
Wayne IN heavy $34.45 $27.50 $61.95 WD →
Wayne IN highway $34.45 $27.50 $61.95 WD →
Wells IN heavy $31.68 $27.50 $59.18 WD →
Wells IN highway $31.68 $27.50 $59.18 WD →
Wells IN highway $34.45 $27.50 $61.95 WD →
Wells IN heavy $34.45 $27.50 $61.95 WD →
White IN heavy $34.45 $27.50 $61.95 WD →
White IN highway $31.68 $27.50 $59.18 WD →
White IN highway $34.45 $27.50 $61.95 WD →
White IN heavy $31.68 $27.50 $59.18 WD →
Whitley IN highway $31.68 $27.50 $59.18 WD →
Whitley IN heavy $31.68 $27.50 $59.18 WD →
Whitley IN heavy $34.45 $27.50 $61.95 WD →
Whitley IN highway $34.45 $27.50 $61.95 WD →
Top-paying counties for LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW →