LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASHs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 246 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH is $62.36/hr, with the middle 80% of counties paying between $61.36 and $63.86/hr. The highest state average is California at $62.59/hr; the lowest is California at $62.59/hr.

Bottom 10%
$61.36
Median
$62.36
Average
$62.59
Top 10%
$63.86

Range: $61.36 – $63.86/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$62.36/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+177.5%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $35.29/hr
Avg total: $62.59/hr
246 rates

All Rates

246 county-level rates for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA heavy $35.06 $27.30 $62.36 WD →
Alameda CA heavy $34.06 $27.30 $61.36 WD →
Alameda CA highway $34.06 $27.30 $61.36 WD →
Alameda CA building $35.06 $27.30 $62.36 WD →
Alameda CA highway $35.06 $27.30 $62.36 WD →
Alameda CA building $34.06 $27.30 $61.36 WD →
Alpine CA highway $36.56 $27.30 $63.86 WD →
Alpine CA building $35.06 $27.30 $62.36 WD →
Alpine CA highway $35.06 $27.30 $62.36 WD →
Alpine CA heavy $36.56 $27.30 $63.86 WD →
Alpine CA heavy $35.06 $27.30 $62.36 WD →
Alpine CA building $36.56 $27.30 $63.86 WD →
Amador CA heavy $35.06 $27.30 $62.36 WD →
Amador CA building $35.06 $27.30 $62.36 WD →
Amador CA heavy $36.56 $27.30 $63.86 WD →
Amador CA highway $36.56 $27.30 $63.86 WD →
Amador CA highway $35.06 $27.30 $62.36 WD →
Amador CA building $36.56 $27.30 $63.86 WD →
Butte CA building $35.06 $27.30 $62.36 WD →
Butte CA highway $35.06 $27.30 $62.36 WD →
Butte CA heavy $36.56 $27.30 $63.86 WD →
Butte CA building $36.56 $27.30 $63.86 WD →
Butte CA highway $36.56 $27.30 $63.86 WD →
Butte CA heavy $35.06 $27.30 $62.36 WD →
Calaveras CA heavy $34.06 $27.30 $61.36 WD →
Calaveras CA building $34.06 $27.30 $61.36 WD →
Calaveras CA heavy $35.06 $27.30 $62.36 WD →
Calaveras CA highway $34.06 $27.30 $61.36 WD →
Calaveras CA highway $35.06 $27.30 $62.36 WD →
Calaveras CA building $35.06 $27.30 $62.36 WD →
Colusa CA building $35.06 $27.30 $62.36 WD →
Colusa CA heavy $36.56 $27.30 $63.86 WD →
Colusa CA highway $35.06 $27.30 $62.36 WD →
Colusa CA highway $36.56 $27.30 $63.86 WD →
Colusa CA building $36.56 $27.30 $63.86 WD →
Colusa CA heavy $35.06 $27.30 $62.36 WD →
Contra Costa CA building $34.06 $27.30 $61.36 WD →
Contra Costa CA heavy $35.06 $27.30 $62.36 WD →
Contra Costa CA heavy $34.06 $27.30 $61.36 WD →
Contra Costa CA highway $35.06 $27.30 $62.36 WD →
Contra Costa CA highway $34.06 $27.30 $61.36 WD →
Contra Costa CA building $35.06 $27.30 $62.36 WD →
El Dorado CA building $36.56 $27.30 $63.86 WD →
El Dorado CA highway $35.06 $27.30 $62.36 WD →
El Dorado CA heavy $35.06 $27.30 $62.36 WD →
El Dorado CA highway $36.56 $27.30 $63.86 WD →
El Dorado CA heavy $36.56 $27.30 $63.86 WD →
El Dorado CA building $35.06 $27.30 $62.36 WD →
Fresno CA highway $34.06 $27.30 $61.36 WD →
Fresno CA building $34.06 $27.30 $61.36 WD →
Fresno CA heavy $35.06 $27.30 $62.36 WD →
Fresno CA heavy $34.06 $27.30 $61.36 WD →
Fresno CA highway $35.06 $27.30 $62.36 WD →
Fresno CA building $35.06 $27.30 $62.36 WD →
Glenn CA building $35.06 $27.30 $62.36 WD →
Glenn CA building $36.56 $27.30 $63.86 WD →
Glenn CA highway $36.56 $27.30 $63.86 WD →
Glenn CA highway $35.06 $27.30 $62.36 WD →
Glenn CA heavy $36.56 $27.30 $63.86 WD →
Glenn CA heavy $35.06 $27.30 $62.36 WD →
Kings CA building $35.06 $27.30 $62.36 WD →
Kings CA heavy $35.06 $27.30 $62.36 WD →
Kings CA heavy $34.06 $27.30 $61.36 WD →
Kings CA building $34.06 $27.30 $61.36 WD →
Kings CA highway $34.06 $27.30 $61.36 WD →
Kings CA highway $35.06 $27.30 $62.36 WD →
Lassen CA heavy $36.56 $27.30 $63.86 WD →
Lassen CA highway $35.06 $27.30 $62.36 WD →
Lassen CA heavy $35.06 $27.30 $62.36 WD →
Lassen CA building $36.56 $27.30 $63.86 WD →
Lassen CA highway $36.56 $27.30 $63.86 WD →
Lassen CA building $35.06 $27.30 $62.36 WD →
Madera CA building $35.06 $27.30 $62.36 WD →
Madera CA heavy $35.06 $27.30 $62.36 WD →
Madera CA building $34.06 $27.30 $61.36 WD →
Madera CA highway $35.06 $27.30 $62.36 WD →
Madera CA highway $34.06 $27.30 $61.36 WD →
Madera CA heavy $34.06 $27.30 $61.36 WD →
Marin CA heavy $35.06 $27.30 $62.36 WD →
Marin CA building $36.56 $27.30 $63.86 WD →
Marin CA highway $35.06 $27.30 $62.36 WD →
Marin CA heavy $36.56 $27.30 $63.86 WD →
Marin CA highway $36.56 $27.30 $63.86 WD →
Marin CA building $35.06 $27.30 $62.36 WD →
Mariposa CA building $35.06 $27.30 $62.36 WD →
Mariposa CA building $34.06 $27.30 $61.36 WD →
Mariposa CA heavy $35.06 $27.30 $62.36 WD →
Mariposa CA heavy $34.06 $27.30 $61.36 WD →
Mariposa CA highway $35.06 $27.30 $62.36 WD →
Mariposa CA highway $34.06 $27.30 $61.36 WD →
Merced CA building $34.06 $27.30 $61.36 WD →
Merced CA heavy $35.06 $27.30 $62.36 WD →
Merced CA heavy $34.06 $27.30 $61.36 WD →
Merced CA highway $35.06 $27.30 $62.36 WD →
Merced CA highway $34.06 $27.30 $61.36 WD →
Merced CA building $35.06 $27.30 $62.36 WD →
Modoc CA building $35.06 $27.30 $62.36 WD →
Modoc CA heavy $35.06 $27.30 $62.36 WD →
Modoc CA building $36.56 $27.30 $63.86 WD →
Modoc CA heavy $36.56 $27.30 $63.86 WD →
Top-paying counties for LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH →