LABORER Construction Specialist Group — Prevailing Wage Rates

Davis-Bacon prevailing wages for LABORER Construction Specialist Groups across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 297 Davis-Bacon rate records nationwide, the median total package (base + fringe) for LABORER Construction Specialist Group is $64.50/hr, with the middle 80% of counties paying between $63.50 and $68.74/hr. The highest state average is California at $64.81/hr; the lowest is California at $64.81/hr.

Bottom 10%
$63.50
Median
$64.50
Average
$64.81
Top 10%
$68.74

Range: $63.50 – $68.74/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2061Construction Laborers.

Davis-Bacon median
$64.50/hr
National median total package (base + fringe)
BLS OEWS market median
$22.47/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+187%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

California CA
Avg base: $37.07/hr
Avg total: $64.81/hr
297 rates

All Rates

297 county-level rates for LABORER Construction Specialist Group, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Alameda CA highway $37.20 $27.30 $64.50 WD →
Alameda CA heavy $37.20 $27.30 $64.50 WD →
Alameda CA highway $36.20 $27.30 $63.50 WD →
Alameda CA building $38.85 $29.89 $68.74 WD →
Alameda CA building $37.20 $27.30 $64.50 WD →
Alameda CA building $36.20 $27.30 $63.50 WD →
Alameda CA heavy $38.85 $29.89 $68.74 WD →
Alameda CA highway $38.85 $29.89 $68.74 WD →
Alameda CA heavy $36.20 $27.30 $63.50 WD →
Alpine CA highway $36.20 $27.30 $63.50 WD →
Alpine CA heavy $37.20 $27.30 $64.50 WD →
Alpine CA highway $37.20 $27.30 $64.50 WD →
Alpine CA building $37.20 $27.30 $64.50 WD →
Alpine CA heavy $36.20 $27.30 $63.50 WD →
Alpine CA building $36.20 $27.30 $63.50 WD →
Amador CA heavy $36.20 $27.30 $63.50 WD →
Amador CA building $37.20 $27.30 $64.50 WD →
Amador CA highway $37.20 $27.30 $64.50 WD →
Amador CA highway $36.20 $27.30 $63.50 WD →
Amador CA heavy $37.20 $27.30 $64.50 WD →
Amador CA building $36.20 $27.30 $63.50 WD →
Butte CA heavy $37.20 $27.30 $64.50 WD →
Butte CA building $37.20 $27.30 $64.50 WD →
Butte CA highway $36.20 $27.30 $63.50 WD →
Butte CA highway $37.20 $27.30 $64.50 WD →
Butte CA building $36.20 $27.30 $63.50 WD →
Butte CA heavy $36.20 $27.30 $63.50 WD →
Calaveras CA heavy $37.20 $27.30 $64.50 WD →
Calaveras CA building $36.20 $27.30 $63.50 WD →
Calaveras CA building $38.85 $29.89 $68.74 WD →
Calaveras CA highway $36.20 $27.30 $63.50 WD →
Calaveras CA building $37.20 $27.30 $64.50 WD →
Calaveras CA highway $38.85 $29.89 $68.74 WD →
Calaveras CA highway $37.20 $27.30 $64.50 WD →
Calaveras CA heavy $36.20 $27.30 $63.50 WD →
Calaveras CA heavy $38.85 $29.89 $68.74 WD →
Colusa CA highway $37.20 $27.30 $64.50 WD →
Colusa CA building $36.20 $27.30 $63.50 WD →
Colusa CA heavy $37.20 $27.30 $64.50 WD →
Colusa CA building $37.20 $27.30 $64.50 WD →
Colusa CA highway $36.20 $27.30 $63.50 WD →
Colusa CA heavy $36.20 $27.30 $63.50 WD →
Contra Costa CA heavy $36.20 $27.30 $63.50 WD →
Contra Costa CA building $36.20 $27.30 $63.50 WD →
Contra Costa CA highway $38.85 $29.89 $68.74 WD →
Contra Costa CA building $37.20 $27.30 $64.50 WD →
Contra Costa CA building $38.85 $29.89 $68.74 WD →
Contra Costa CA highway $37.20 $27.30 $64.50 WD →
Contra Costa CA highway $36.20 $27.30 $63.50 WD →
Contra Costa CA heavy $37.20 $27.30 $64.50 WD →
Contra Costa CA heavy $38.85 $29.89 $68.74 WD →
El Dorado CA highway $36.20 $27.30 $63.50 WD →
El Dorado CA highway $37.20 $27.30 $64.50 WD →
El Dorado CA heavy $37.20 $27.30 $64.50 WD →
El Dorado CA building $36.20 $27.30 $63.50 WD →
El Dorado CA heavy $36.20 $27.30 $63.50 WD →
El Dorado CA building $37.20 $27.30 $64.50 WD →
Fresno CA heavy $36.20 $27.30 $63.50 WD →
Fresno CA heavy $37.20 $27.30 $64.50 WD →
Fresno CA heavy $38.85 $29.89 $68.74 WD →
Fresno CA highway $37.20 $27.30 $64.50 WD →
Fresno CA highway $38.85 $29.89 $68.74 WD →
Fresno CA highway $36.20 $27.30 $63.50 WD →
Fresno CA building $37.20 $27.30 $64.50 WD →
Fresno CA building $36.20 $27.30 $63.50 WD →
Fresno CA building $38.85 $29.89 $68.74 WD →
Glenn CA highway $36.20 $27.30 $63.50 WD →
Glenn CA heavy $36.20 $27.30 $63.50 WD →
Glenn CA heavy $37.20 $27.30 $64.50 WD →
Glenn CA building $36.20 $27.30 $63.50 WD →
Glenn CA highway $37.20 $27.30 $64.50 WD →
Glenn CA building $37.20 $27.30 $64.50 WD →
Kings CA heavy $36.20 $27.30 $63.50 WD →
Kings CA building $36.20 $27.30 $63.50 WD →
Kings CA heavy $38.85 $29.89 $68.74 WD →
Kings CA building $37.20 $27.30 $64.50 WD →
Kings CA building $38.85 $29.89 $68.74 WD →
Kings CA heavy $37.20 $27.30 $64.50 WD →
Kings CA highway $38.85 $29.89 $68.74 WD →
Kings CA highway $37.20 $27.30 $64.50 WD →
Kings CA highway $36.20 $27.30 $63.50 WD →
Lassen CA highway $36.20 $27.30 $63.50 WD →
Lassen CA highway $37.20 $27.30 $64.50 WD →
Lassen CA building $36.20 $27.30 $63.50 WD →
Lassen CA heavy $37.20 $27.30 $64.50 WD →
Lassen CA heavy $36.20 $27.30 $63.50 WD →
Lassen CA building $37.20 $27.30 $64.50 WD →
Madera CA building $36.20 $27.30 $63.50 WD →
Madera CA heavy $36.20 $27.30 $63.50 WD →
Madera CA heavy $37.20 $27.30 $64.50 WD →
Madera CA heavy $38.85 $29.89 $68.74 WD →
Madera CA building $38.85 $29.89 $68.74 WD →
Madera CA highway $38.85 $29.89 $68.74 WD →
Madera CA highway $37.20 $27.30 $64.50 WD →
Madera CA highway $36.20 $27.30 $63.50 WD →
Madera CA building $37.20 $27.30 $64.50 WD →
Marin CA heavy $37.20 $27.30 $64.50 WD →
Marin CA building $37.20 $27.30 $64.50 WD →
Marin CA building $36.20 $27.30 $63.50 WD →
Marin CA heavy $36.20 $27.30 $63.50 WD →
Top-paying counties for LABORER Construction Specialist Group →